Wage Determination FL20260087-16479-res
St Lucie, FL · residential · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination FL20260087-16479-res covers 35 trade classifications for residential construction in St Lucie, FL. Total packages (base + fringe) range from $9.00/hr to $55.45/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: FL20260087-16479-res
Revision: 1
Type: residential
County: St Lucie
State: FL
Effective: May 17, 2026
Trades covered: 35
Highest rate: $55.45/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $20.00 | $0.00 | $20.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $14.89 | $0.00 | $14.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $16.19 | $0.00 | $16.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.25 | $15.20 | $55.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $9.65 | $0.00 | $9.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE AND IRRIGATION | $9.15 | $0.00 | $9.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $11.51 | $0.00 | $11.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.46 | $0.00 | $10.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $11.79 | $0.00 | $11.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ROOF TEAROFF | $9.00 | $0.00 | $9.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ASPHALT PAVER | $11.63 | $0.00 | $11.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE | $27.00 | $14.90 | $41.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 | $17.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $13.67 | $0.00 | $13.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $37.57 | $14.90 | $52.47 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $39.38 | $14.90 | $54.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $40.40 | $14.90 | $55.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $37.07 | $14.90 | $51.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DISTRIBUTOR | $11.41 | $0.00 | $11.41 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: EXCAVATOR | $13.50 | $0.00 | $13.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $17.50 | $0.00 | $17.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $15.50 | $0.00 | $15.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $16.48 | $0.00 | $16.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: OILER | $27.53 | $14.90 | $42.43 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $10.58 | $0.00 | $10.58 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCREED | $10.93 | $0.00 | $10.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACKHOE | $15.68 | $0.00 | $15.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACTOR | $10.20 | $0.00 | $10.20 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $23.84 | $14.75 | $38.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $25.00 | $1.17 | $26.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS | $14.50 | $0.00 | $14.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: METAL ROOF | $16.99 | $0.00 | $16.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, EXCLUDES METAL ROOF INSTALLATION | $29.10 | $14.68 | $43.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $10.22 | $0.00 | $10.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $12.10 | $0.00 | $12.10 | $0.00 | $0.00 | $0.00 | $0.00 |