Wage Determination FL20260020-16521-bld

Liberty, FL · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination FL20260020-16521-bld covers 14 trade classifications for building construction in Liberty, FL. Total packages (base + fringe) range from $8.14/hr to $49.01/hr, with the highest going to OPERATOR: CRANE. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: FL20260020-16521-bld
Revision: 1
Type: building
County: Liberty
State: FL
Effective: May 17, 2026
Trades covered: 14
Highest rate: $49.01/hr
Official source: SAM.gov reference FL20260020View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $13.19 $0.00 $13.19 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $11.50 $0.00 $11.50 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.50 $13.85 $47.35 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND REINFORCING $29.50 $12.98 $42.48 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $8.14 $0.00 $8.14 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $11.42 $1.95 $13.37 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $12.43 $0.00 $12.43 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $35.41 $13.60 $49.01 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $9.58 $0.00 $9.58 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $10.10 $0.00 $10.10 $0.00 $0.00 $0.00 $0.00
PLASTERER $15.90 $0.00 $15.90 $0.00 $0.00 $0.00 $0.00
PLUMBER $10.48 $2.06 $12.54 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 11.72 2.19 ROOFER: BUILT UP, COMPOSITION, HOT TAR AND SINGLE PLY $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND 10 YARD HAUL AWAY $8.00 $0.15 $8.15 $0.00 $0.00 $0.00 $0.00
View all WDs for Liberty → Revision history →