Wage Determination FL20260006-16481-bld

Bradford, FL · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination FL20260006-16481-bld covers 14 trade classifications for building construction in Bradford, FL. Total packages (base + fringe) range from $8.15/hr to $50.77/hr, with the highest going to IRONWORKER: STRUCTURAL AND REINFORCING. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: FL20260006-16481-bld
Revision: 1
Type: building
County: Bradford
State: FL
Effective: May 17, 2026
Trades covered: 14
Highest rate: $50.77/hr
Official source: SAM.gov reference FL20260006View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $14.79 $1.81 $16.60 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.79 $0.00 $16.79 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.50 $13.85 $47.35 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND REINFORCING $32.00 $18.77 $50.77 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.00 $0.00 $9.00 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $11.42 $1.95 $13.37 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $13.19 $0.00 $13.19 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $35.41 $13.60 $49.01 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $9.58 $0.00 $9.58 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $10.10 $0.00 $10.10 $0.00 $0.00 $0.00 $0.00
PLUMBER $12.27 $3.33 $15.60 $0.00 $0.00 $0.00 $0.00
ROOFER: BUILT UP, COMPOSITION, HOT TAR AND SINGLE PLY $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION A: HOLIDAY PAY: NEW YEAR'S DAY, MEMORIAL DAY, JULY FOURTH, LABOR DAY, THANKSGIVING DAY, DAY AFTER $31.64 $15.98 $47.62 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND 10 YARD HAUL AWAY $8.00 $0.15 $8.15 $0.00 $0.00 $0.00 $0.00
View all WDs for Bradford → Revision history →