Wage Determination DE20260012-16441-hvy

Sussex, DE · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination DE20260012-16441-hvy covers 13 trade classifications for heavy construction in Sussex, DE. Total packages (base + fringe) range from $20.48/hr to $95.97/hr, with the highest going to LINE CONSTRUCTION: LINEMAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: DE20260012-16441-hvy
Revision: 1
Type: heavy
County: Sussex
State: DE
Effective: May 17, 2026
Trades covered: 13
Highest rate: $95.97/hr
Official source: SAM.gov reference DE20260012View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $38.27 $25.34 $63.61 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $25.78 $0.58 $26.36 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $34.96 $23.87 $58.83 $0.00 $0.00 $0.00 $0.00
LABORER: BACKFILLER AND TAMPER $31.45 $25.70 $57.15 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $16.42 $4.06 $20.48 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $18.63 $2.68 $21.31 $0.00 $0.00 $0.00 $0.00
LABORER: TRENCHER HAND GUIDED $29.45 $25.70 $55.15 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN $65.10 $30.87 $95.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.62 $7.56 $28.18 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $26.46 $7.56 $34.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $25.55 $7.56 $33.11 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE, FORKLIFT, AND SCRAPER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGI $48.73 $32.23 $80.96 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $22.32 $7.56 $29.88 $0.00 $0.00 $0.00 $0.00
View all WDs for Sussex → Revision history →