Wage Determination CT20260019-16434-bld
Litchfield, CT · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination CT20260019-16434-bld covers 10 trade classifications for building construction in Litchfield, CT. Total packages (base + fringe) range from $29.36/hr to $96.21/hr, with the highest going to SHEET METAL WORKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: CT20260019-16434-bld
Revision: 2
Type: building
County: Litchfield
State: CT
Effective: May 17, 2026
Trades covered: 10
Highest rate: $96.21/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $42.03 | $29.19 | $71.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $29.36 | $0.00 | $29.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $47.40 | $36.74 | $84.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| HEAT & FROST INSULATOR | $48.81 | $33.65 | $82.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING, STRUCTURAL | $45.25 | $43.62 | $88.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $35.70 | $28.85 | $64.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER | $39.57 | $26.75 | $66.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: COMPOSITION | $45.15 | $23.53 | $68.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: SLATE AND TILE | $45.65 | $23.53 | $69.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $50.60 | $45.61 | $96.21 | $0.00 | $0.00 | $0.00 | $0.00 |