1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER 2) CRANES BAUER DRILL/CAISSON 3) CRANES A. PAID HOLIDAYS: NEW YEAR'S DAY, G
|
$57.78 |
$29.80 |
$87.58 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYERS, CEMENT MASONS, CEMENT FINISHERS, PLASTERERS, STONE MASONS
|
$46.09 |
$36.29 |
$82.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTERS, PILEDRIVERS
|
$42.03 |
$29.19 |
$71.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTERS: DIVER TENDERS
|
$42.03 |
$29.19 |
$71.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTERS: DIVERS
|
$50.49 |
$29.19 |
$79.68 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CRANE WITH 250 FT. BOOM: $5.00 EXTRA. CRANE WITH 300 FT. BOOM: $7.00 EXTRA. CRANE WITH 400 FT. BOOM; $10.00 EXTRA. 1) CRANE HANDLING OR ERECTING STRUC
|
$56.79 |
$29.80 |
$86.59 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$46.48 |
$38.05 |
$84.53 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIANS
|
$48.25 |
$36.67 |
$84.92 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKERS: REINFORCING & STRUCTURAL A. PAID HOLIDAY: LABOR DAY PROVIDED EMPLOYEE HAS BEEN ON THE PAYROLL FOR THE 5 CONSECUTIVE WORK DAYS PRIOR TO LA
|
$45.25 |
$43.62 |
$88.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 1 LABORERS, CONCRETE SPECIALIST
|
$35.70 |
$28.85 |
$64.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN
|
$35.95 |
$28.85 |
$64.80 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER, MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CU
|
$36.20 |
$28.85 |
$65.05 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 4 ASBESTOS/LEAD REMOVAL
|
$38.70 |
$28.85 |
$67.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 5 BLASTERS
|
$37.45 |
$28.85 |
$66.30 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 6 TOXIC WASTE REMOVER
|
$37.70 |
$28.85 |
$66.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 7 TRAFFIC CONTROL SIGNALMAN
|
$21.42 |
$28.85 |
$50.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 8: ACETYLENE BURNER
|
$36.70 |
$28.85 |
$65.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 9: TOXIC WASTE REMOVERS A OR B WITH PPE
|
$38.70 |
$28.85 |
$67.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: CONCRETE WORKERS, FORM MOVERS AND STRIPPERS A. PAID HOLIDAYS: ON TUNNEL WORK ON
|
$36.96 |
$28.85 |
$65.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: FORM ERECTORS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL D
|
$37.29 |
$28.85 |
$66.14 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: BRAKEMEN, TRACKMEN, TUNNEL LABORERS, SHAFT LABORERS A. PAI
|
$36.96 |
$28.85 |
$65.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: LABORERS TOPSIDE, CAGE TENDERS, BELLMAN A. PAID HOLIDAYS
|
$36.85 |
$28.85 |
$65.70 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: MINERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S D
|
$37.93 |
$28.85 |
$66.78 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: BRAKEMEN AND TRACKMEN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR
|
$36.96 |
$28.85 |
$65.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: MINERS, MOTORMEN, MUCKING MACHINE OPERATORS, NOZZLEMEN, GROUT MEN, SH
|
$37.93 |
$28.85 |
$66.78 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BLASTER A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, ME
|
$44.42 |
$28.85 |
$73.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BRAKEMEN, TRACKMEN, GROUTMAN, LABORERS, OUTSIDE LOCK TENDER, GAUG
|
$44.22 |
$28.85 |
$73.07 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: CHANGE HOUSE ATTENDANTS, POWDER WATCHMEN, TOP ON IRON BOLT A. PAI
|
$42.24 |
$28.85 |
$71.09 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: MUCKING MACHINE OPERATOR A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: N
|
$45.01 |
$28.85 |
$73.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MILLWRIGHT
|
$45.14 |
$30.24 |
$75.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: BLAST AND SPRAY
|
$42.57 |
$26.75 |
$69.32 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: BRUSH AND ROLL
|
$39.57 |
$26.75 |
$66.32 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: BRUSH, ROLLER, BLASTING SPRAY
|
$59.70 |
$26.90 |
$86.60 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: TANKS, TOWERS, SWING
|
$41.57 |
$26.75 |
$68.32 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 1 CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR TONE; HOISTING ENGINEER. HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER
|
$58.19 |
$29.80 |
$87.99 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 10 VIBRATORY HAMMER, ICE MACHINE, DIESEL AND AIR HAMMER, ETC. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL
|
$45.96 |
$29.80 |
$75.76 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 11 CONVEYOR; EARTH ROLLER; POWER PAVEMENT BREAKER; ROBOT DEMOLITION EQUIPMENT. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD
|
$45.96 |
$29.80 |
$75.76 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 12 WELLPOINT OPERATOR. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THAN
|
$45.87 |
$29.80 |
$75.67 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 13 PORTABLE ASPHALT PLANT OPERATOR; PORTABLE CONCRETE PLANT OPERATOR; PORTABLE CRUSHER PLANT OPERATOR. PORTABLE GROUT
|
$47.91 |
$29.80 |
$77.71 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 14 COMPRESSOR BATTERY OPERATOR. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
|
$45.12 |
$29.80 |
$74.92 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 15 POWER SAFETY BOAT; VACUUM TRUCK; ZIM MIXER; SWEEPER; A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY
|
$44.70 |
$29.80 |
$74.50 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 16 ELEVATOR OPERATOR; TOW MOTOR OPERATOR. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE D
|
$43.60 |
$29.80 |
$73.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 17 GENERATOR OPERATOR; COMPRESSOR OPERATOR; PUMP OPERATOR; WELDING MACHINE OPERATOR; HEATER OPERATOR. A. PAID HOLIDAY
|
$43.06 |
$29.80 |
$72.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 18 MAINTENANCE ENGINEER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, TH
|
$42.20 |
$29.80 |
$72.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 19 FRONT END LOADER; WORK BOAT 26 FT. AND OVER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPEND
|
$53.33 |
$29.80 |
$83.13 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 20 EXCAVATOR OVER 2 CUBIC YARDS; PILE DRIVER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDEN
|
$52.92 |
$29.80 |
$82.72 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 21 EXCAVATOR, GRADALL, MASTER MECHANIC, HOISTING ENGINEER, RUBBER TIRE EXCAVATOR, GRADER OPERATOR, BULLDOZER FINEGRAD
|
$51.92 |
$29.80 |
$81.72 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 4 TRENCHING MACHINES; LIGHTER DERRICK; CONCRETE FINISHING MACHINE, CMI MACHINE OR SIMILAR; KOEHRING LOADER SKOOPER)
|
$51.92 |
$29.80 |
$81.72 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 5 SPECIALTY RAILROAD EQUIPMENT; ASPHALT SPREADER; ASPHALT RECLAIMING ACHINE; LINE GRINDER; CONCRETE PUMPS; DRILLS WIT
|
$50.63 |
$29.80 |
$80.43 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 6 FRONT END LOADER; BULLDOZER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR D
|
$50.22 |
$29.80 |
$80.02 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 7 ASPHALT ROLLER; CONCRETE SAWS AND CUTTERS; VERMEER CONCRETE CUTTER; STUMP GRINDER; SCRAPER; SNOOPER; SKIDDER; MILLI
|
$49.25 |
$29.80 |
$79.05 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 8 MECHANIC; GREASE TRUCK OPERATOR; HYDROBLASTER; BARRIER MOVER; POWER STONE SPREADER; WELDER; WORK BOAT UNDER 26 FT
|
$49.25 |
$29.80 |
$79.05 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 9 FRONT END LOADER; SKID STEER LOADER;; FORK LIFT; POWER CHIPPER; LANDSCAPE EQUIPMENT.VACUUM EXCAVATION TRUCK AND HYD
|
$48.67 |
$29.80 |
$78.47 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: 2 AXLE HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DA
|
$36.16 |
$32.68 |
$68.84 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: 2 AXLE READY MIX HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEP
|
$36.27 |
$32.68 |
$68.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: 3 AXLE HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DA
|
$36.27 |
$32.68 |
$68.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: 3 AXLE READY MIX HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEP
|
$36.33 |
$32.68 |
$69.01 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: 4 AXLE HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DA
|
$36.39 |
$32.68 |
$69.07 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: 4 AXLE READY MIX HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEP
|
$37.19 |
$32.68 |
$69.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: HEAVY DUTY TRAILER 40 TONS AND OVER HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY
|
$38.66 |
$32.68 |
$71.34 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: HEAVY DUTY TRAILER UP TO 40 TONS HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEM
|
$37.39 |
$32.68 |
$70.07 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: SNORKLE TRUCK HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPEND
|
$36.54 |
$32.68 |
$69.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: SPECIALIZED HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDEN
|
$36.44 |
$32.68 |
$69.12 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |