Wage Determination CO20260022-16373-bld
El Paso, CO · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination CO20260022-16373-bld covers 26 trade classifications for building construction in El Paso, CO. Total packages (base + fringe) range from $14.80/hr to $95.01/hr, with the highest going to ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: CO20260022-16373-bld
Revision: 1
Type: building
County: El Paso
State: CO
Effective: May 17, 2026
Trades covered: 26
Highest rate: $95.01/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL | $36.98 | $16.82 | $53.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $21.96 | $0.00 | $21.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $22.63 | $6.98 | $29.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $34.73 | $15.15 | $49.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.70 | $18.47 | $59.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA | $56.57 | $38.44 | $95.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $39.21 | $12.50 | $51.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $39.21 | $12.50 | $51.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $13.40 | $1.40 | $14.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $15.99 | $0.00 | $15.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $16.00 | $0.00 | $16.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $16.96 | $3.68 | $20.64 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.26 | $8.62 | $28.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $18.58 | $2.42 | $21.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $21.50 | $0.00 | $21.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $27.41 | $11.56 | $38.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $17.20 | $0.00 | $17.20 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $47.60 | $18.10 | $65.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $47.60 | $18.10 | $65.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $37.34 | $15.20 | $52.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $36.09 | $15.20 | $51.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $16.71 | $0.00 | $16.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $24.00 | $2.18 | $26.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER INCLUDES HVAC DUCT INSTALLATION | $43.05 | $22.65 | $65.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $48.60 | $27.57 | $76.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $17.34 | $0.00 | $17.34 | $0.00 | $0.00 | $0.00 | $0.00 |