Wage Determination CO20260004-16382-res

Douglas, CO · residential · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination CO20260004-16382-res covers 34 trade classifications for residential construction in Douglas, CO. Total packages (base + fringe) range from $8.86/hr to $66.58/hr, with the highest going to PIPEFITTER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: CO20260004-16382-res
Revision: 1
Type: residential
County: Douglas
State: CO
Effective: May 17, 2026
Trades covered: 34
Highest rate: $66.58/hr
Official source: SAM.gov reference CO20260004View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $41.91 $12.49 $54.40 $0.00 $0.00 $0.00 $0.00
CARPENTER $16.36 $1.38 $17.74 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.80 $0.00 $16.80 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $13.00 $0.00 $13.00 $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER/FRAMER $17.13 $2.63 $19.76 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $35.40 $16.06 $51.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $31.96 $12.50 $44.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $31.75 $13.25 $45.00 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $30.53 $16.30 $46.83 $0.00 $0.00 $0.00 $0.00
FORMBUILDER/FORMSETTER $12.78 $1.98 $14.76 $0.00 $0.00 $0.00 $0.00
GLAZIER $37.26 $13.15 $50.41 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $39.21 $12.50 $51.71 $0.00 $0.00 $0.00 $0.00
LABORERS $8.86 $0.00 $8.86 $0.00 $0.00 $0.00 $0.00
LABORERS: BRICK FINISHERS/TENDERS $11.25 $0.00 $11.25 $0.00 $0.00 $0.00 $0.00
LABORERS: CONCRETE/MASON TENDERS $10.00 $0.00 $10.00 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $13.62 $3.39 $17.01 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $44.15 $22.43 $66.58 $0.00 $0.00 $0.00 $0.00
PLUMBER $23.24 $5.35 $28.59 $0.00 $0.00 $0.00 $0.00
PLUMBER: & PIPEFITTERS $41.32 $16.01 $57.33 $0.00 $0.00 $0.00 $0.00
PLUMBERS & PIPEFITTERS TRAVEL OR ZONE PAY: TRAVEL OR ZONE PAY SHALL APPLY TO PROJECTS OVER SEVENTY-FIVE MILES FROM THE INTERSECTION OF I-25 AND THE EL $41.40 $17.17 $58.57 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $12.98 $3.31 $16.29 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZER $34.05 $14.25 $48.30 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: FRONT END LOADER $16.50 $0.00 $16.50 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: MOTOR GRADER: BLADE-FINISH $34.58 $14.25 $48.83 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: MOTOR GRADER: BLADE-ROUGH $34.05 $14.25 $48.30 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ROLLER: SELF-PROPELLED RUBBER TIRES UNDER 5 TONS $33.62 $14.25 $47.87 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: SCRAPER: SINGLE BOWL INCLUDING PUPS 40 CUBIC YARDS AND TANDEM BOWLS AND OVER $34.41 $14.25 $48.66 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: SCRAPER: SINGLE BOWL UNDER 40 CUBIC YARDS $34.21 $14.25 $48.46 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: WATER WAGON $34.05 $14.25 $48.30 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS:(ROLLER: SELF-PROPELLED ALL TYPES OVER 5 TONS $34.05 $14.25 $48.30 $0.00 $0.00 $0.00 $0.00
ROOFER $14.73 $0.00 $14.73 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $43.05 $22.65 $65.70 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: ALL OTHER WORK $17.30 $4.05 $21.35 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $18.47 $3.74 $22.21 $0.00 $0.00 $0.00 $0.00
View all WDs for Douglas → Revision history →