Wage Determination AZ20260027-14343-bld
Navajo, AZ · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination AZ20260027-14343-bld covers 25 trade classifications for building construction in Navajo, AZ. Total packages (base + fringe) range from $9.31/hr to $54.62/hr, with the highest going to ELECTRICIAN: INCLUDES ALARM INSTALLATION AND LOW VOLTAGE WIRING REMAINING PART. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: AZ20260027-14343-bld
Revision: 2
Type: building
County: Navajo
State: AZ
Effective: May 17, 2026
Trades covered: 25
Highest rate: $54.62/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ADD $6.50 | $33.00 | $19.91 | $52.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER ZONE PAY: ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER H | $32.29 | $9.97 | $42.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $33.55 | $14.17 | $47.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $26.24 | $8.86 | $35.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $17.71 | $2.60 | $20.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER ZONE PAY: ZONE A: FREE ZONE: A DISTANCE OF 0 TO 100 MILES FROM THE OLD PHOENIX COURTHOUSE. ZONE B: A DISTANCE OF 101 MILES AND | $27.05 | $7.49 | $34.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER ZONE PAY: ZONE A: FREE ZONE: A DISTANCE OF 0 TO 100 MILES FROM THE OLD PHOENIX COURTHOUSE. ZONE B: A DISTANCE OF 101 MILES AND | $23.55 | $7.49 | $31.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: INCLUDES ALARM INSTALLATION AND LOW VOLTAGE WIRING REMAINING PART | $39.09 | $15.53 | $54.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: INCLUDES ALARM INSTALLATION AND LOW VOLTAGE WIRING SOUTH AND EAST OF BOUNDARY BEGINNING AT A POINT WHERE CLEAR CREEK CROSSES THE COCONINO | $36.50 | $14.84 | $51.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LAYER: HARDWOOD AND RESILIENT FLOORING | $17.98 | $6.50 | $24.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $15.98 | $0.79 | $16.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.98 | $3.13 | $15.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE & IRRIGATION | $9.31 | $0.00 | $9.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $16.05 | $1.49 | $17.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER-BRICK | $27.41 | $9.26 | $36.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE | $14.00 | $1.80 | $15.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $16.13 | $0.00 | $16.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $22.21 | $6.12 | $28.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $19.63 | $2.83 | $22.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE 100 TONS AND OVER | $35.52 | $12.57 | $48.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE 15 TONS TO 100 TONS, TOWER CRANE | $34.49 | $12.57 | $47.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $28.17 | $7.37 | $35.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $18.68 | $4.91 | $23.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $16.48 | $2.94 | $19.42 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $15.93 | $0.45 | $16.38 | $0.00 | $0.00 | $0.00 | $0.00 |