Wage Determination AR20260057-16268-hvy
Sebastian, AR · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination AR20260057-16268-hvy covers 11 trade classifications for heavy construction in Sebastian, AR. Total packages (base + fringe) range from $12.16/hr to $31.00/hr, with the highest going to OPERATOR: CRANE. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: AR20260057-16268-hvy
Revision: 1
Type: heavy
County: Sebastian
State: AR
Effective: May 17, 2026
Trades covered: 11
Highest rate: $31.00/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $16.47 | $1.93 | $18.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $15.23 | $0.00 | $15.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $22.88 | $7.19 | $30.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $12.16 | $0.00 | $12.16 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $14.54 | $1.82 | $16.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.35 | $0.00 | $16.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $17.00 | $1.92 | $18.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $24.21 | $6.79 | $31.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $15.45 | $0.00 | $15.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $18.00 | $0.00 | $18.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $14.05 | $3.04 | $17.09 | $0.00 | $0.00 | $0.00 | $0.00 |