Wage Determination AR20260056-16231-hvy
Pulaski, AR · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination AR20260056-16231-hvy covers 11 trade classifications for heavy construction in Pulaski, AR. Total packages (base + fringe) range from $12.16/hr to $32.97/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: AR20260056-16231-hvy
Revision: 1
Type: heavy
County: Pulaski
State: AR
Effective: May 17, 2026
Trades covered: 11
Highest rate: $32.97/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $16.46 | $0.00 | $16.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $18.34 | $3.41 | $21.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $23.22 | $9.75 | $32.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $12.16 | $0.00 | $12.16 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $13.39 | $2.19 | $15.58 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.03 | $0.00 | $18.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $16.32 | $1.65 | $17.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $24.21 | $6.79 | $31.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $15.43 | $0.00 | $15.43 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $18.00 | $0.00 | $18.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $13.71 | $0.00 | $13.71 | $0.00 | $0.00 | $0.00 | $0.00 |