Wage Determination AL20260121-15784-hvy

Greene, AL · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination AL20260121-15784-hvy covers 16 trade classifications for heavy construction in Greene, AL. Total packages (base + fringe) range from $8.96/hr to $47.78/hr, with the highest going to IRONWORKER, STRUCTURAL. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: AL20260121-15784-hvy
Revision: 1
Type: heavy
County: Greene
State: AL
Effective: May 17, 2026
Trades covered: 16
Highest rate: $47.78/hr
Official source: SAM.gov reference AL20260121View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $14.60 $0.00 $14.60 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $11.94 $0.40 $12.34 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $31.00 $16.22 $47.22 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $33.75 $14.03 $47.78 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $8.96 $0.00 $8.96 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $10.07 $1.37 $11.44 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: BACKHOE, CRANE, CHERRY PICKER, FRONT END LOADER, HOIST, AND MECHANIC $31.52 $13.98 $45.50 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: OILER $28.45 $13.98 $42.43 $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $13.36 $0.00 $13.36 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $17.00 $0.65 $17.65 $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $14.00 $0.00 $14.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $19.40 $5.76 $25.16 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.58 $4.66 $20.24 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $11.48 $2.70 $14.18 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACKHOE $11.50 $0.44 $11.94 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $10.00 $0.00 $10.00 $0.00 $0.00 $0.00 $0.00
View all WDs for Greene → Revision history →