Wage Determination AL20260117-15805-hvy

Colbert, AL · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination AL20260117-15805-hvy covers 8 trade classifications for heavy construction in Colbert, AL. Total packages (base + fringe) range from $13.71/hr to $45.04/hr, with the highest going to CARPENTER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: AL20260117-15805-hvy
Revision: 1
Type: heavy
County: Colbert
State: AL
Effective: May 17, 2026
Trades covered: 8
Highest rate: $45.04/hr
Official source: SAM.gov reference AL20260117View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $30.26 $14.78 $45.04 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES $13.71 $0.00 $13.71 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.56 $0.00 $19.56 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES $13.40 $3.60 $17.00 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER, INCLUDES WATER SEWER LINES $14.65 $0.00 $14.65 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.18 $0.00 $17.18 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER, INCLUDES WATER SEWER LINES $17.64 $2.14 $19.78 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES $12.56 $2.12 $14.68 $0.00 $0.00 $0.00 $0.00
View all WDs for Colbert → Revision history →