Wage Determination AL20260116-15791-hvy
Shelby, AL · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination AL20260116-15791-hvy covers 8 trade classifications for heavy construction in Shelby, AL. Total packages (base + fringe) range from $13.71/hr to $28.85/hr, with the highest going to CARPENTER, INCLUDES FORM WORK. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: AL20260116-15791-hvy
Revision: 1
Type: heavy
County: Shelby
State: AL
Effective: May 17, 2026
Trades covered: 8
Highest rate: $28.85/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $20.26 | $8.59 | $28.85 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES | $13.71 | $0.00 | $13.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $20.86 | $4.04 | $24.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES | $13.04 | $1.41 | $14.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER, INCLUDES WATER SEWER LINES | $13.91 | $2.04 | $15.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES | $18.13 | $3.66 | $21.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER, INCLUDES WATER SEWER LINES | $17.64 | $2.14 | $19.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES | $12.25 | $2.58 | $14.83 | $0.00 | $0.00 | $0.00 | $0.00 |