Wage Determination AL20260116-15791-hvy

Shelby, AL · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination AL20260116-15791-hvy covers 8 trade classifications for heavy construction in Shelby, AL. Total packages (base + fringe) range from $13.71/hr to $28.85/hr, with the highest going to CARPENTER, INCLUDES FORM WORK. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: AL20260116-15791-hvy
Revision: 1
Type: heavy
County: Shelby
State: AL
Effective: May 17, 2026
Trades covered: 8
Highest rate: $28.85/hr
Official source: SAM.gov reference AL20260116View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $20.26 $8.59 $28.85 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES $13.71 $0.00 $13.71 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $20.86 $4.04 $24.90 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES $13.04 $1.41 $14.45 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER, INCLUDES WATER SEWER LINES $13.91 $2.04 $15.95 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES $18.13 $3.66 $21.79 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER, INCLUDES WATER SEWER LINES $17.64 $2.14 $19.78 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES $12.25 $2.58 $14.83 $0.00 $0.00 $0.00 $0.00
View all WDs for Shelby → Revision history →