Wage Determination AL20260115-15830-hvy
Autauga, AL · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination AL20260115-15830-hvy covers 8 trade classifications for heavy construction in Autauga, AL. Total packages (base + fringe) range from $11.95/hr to $26.63/hr, with the highest going to CARPENTER, INCLUDES FORM WORK. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: AL20260115-15830-hvy
Revision: 1
Type: heavy
County: Autauga
State: AL
Effective: May 17, 2026
Trades covered: 8
Highest rate: $26.63/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $18.72 | $7.91 | $26.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES | $13.78 | $0.00 | $13.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $19.56 | $0.00 | $19.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES | $12.33 | $0.00 | $12.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER, INCLUDES WATER SEWER LINES | $11.95 | $0.00 | $11.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES | $14.84 | $0.00 | $14.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER, INCLUDES WATER SEWER LINES | $17.64 | $2.14 | $19.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES | $12.56 | $2.12 | $14.68 | $0.00 | $0.00 | $0.00 | $0.00 |