Wage Determination AL20260097-15792-bld
St Clair, AL · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination AL20260097-15792-bld covers 28 trade classifications for building construction in St Clair, AL. Total packages (base + fringe) range from $12.22/hr to $58.13/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: AL20260097-15792-bld
Revision: 1
Type: building
County: St Clair
State: AL
Effective: May 17, 2026
Trades covered: 28
Highest rate: $58.13/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.10 | $16.40 | $47.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $34.21 | $23.92 | $58.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $22.00 | $0.00 | $22.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, AND SCAFFOLD BUILDER | $16.06 | $0.00 | $16.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $19.19 | $0.00 | $19.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $17.57 | $2.41 | $19.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $23.00 | $5.64 | $28.64 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $33.75 | $14.03 | $47.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $33.75 | $14.03 | $47.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $14.74 | $3.25 | $17.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $12.22 | $0.00 | $12.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $14.23 | $0.00 | $14.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $15.59 | $0.00 | $15.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $19.96 | $0.40 | $20.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $17.52 | $0.89 | $18.41 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $14.69 | $0.00 | $14.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $14.00 | $1.78 | $15.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $15.31 | $1.41 | $16.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $14.31 | $0.00 | $14.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $35.25 | $15.76 | $51.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $18.97 | $0.36 | $19.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $32.57 | $14.05 | $46.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $32.57 | $14.05 | $46.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $32.57 | $14.05 | $46.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 28.00 4.17 ROOFER | $13.66 | $0.00 | $13.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $20.00 | $3.77 | $23.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $20.00 | $0.00 | $20.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $13.60 | $0.00 | $13.60 | $0.00 | $0.00 | $0.00 | $0.00 |