Wage Determination AL20260079-15774-bld
Cherokee, AL · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination AL20260079-15774-bld covers 13 trade classifications for building construction in Cherokee, AL. Total packages (base + fringe) range from $13.13/hr to $58.13/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: AL20260079-15774-bld
Revision: 1
Type: building
County: Cherokee
State: AL
Effective: May 17, 2026
Trades covered: 13
Highest rate: $58.13/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BOILERMAKER | $34.21 | $23.92 | $58.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $17.89 | $4.07 | $21.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $16.50 | $1.12 | $17.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $21.59 | $6.39 | $27.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| HVAC MECHANIC | $20.50 | $2.12 | $22.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $13.13 | $0.00 | $13.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.48 | $11.78 | $32.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $15.72 | $2.64 | $18.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $15.10 | $0.00 | $15.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $36.10 | $15.95 | $52.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $29.90 | $14.55 | $44.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $14.05 | $0.00 | $14.05 | $0.00 | $0.00 | $0.00 | $0.00 |