Wage Determination AL20260067-15813-hvy
Marshall, AL · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination AL20260067-15813-hvy covers 15 trade classifications for heavy construction in Marshall, AL. Total packages (base + fringe) range from $9.45/hr to $47.80/hr, with the highest going to POWER EQUIPMENT OPERATORS: CRANE. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: AL20260067-15813-hvy
Revision: 1
Type: heavy
County: Marshall
State: AL
Effective: May 17, 2026
Trades covered: 15
Highest rate: $47.80/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ELECTRICIAN | $15.96 | $3.57 | $19.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $9.79 | $0.00 | $9.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $10.13 | $0.00 | $10.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE | $14.24 | $2.31 | $16.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $16.60 | $2.64 | $19.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DRILL | $9.50 | $2.36 | $11.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $12.59 | $1.33 | $13.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $11.67 | $0.00 | $11.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $9.45 | $0.00 | $9.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCRAPER | $9.78 | $0.18 | $9.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACKHOE | $12.00 | $0.00 | $12.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: CHERRY PICKER | $30.24 | $15.37 | $45.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: CRANE | $32.43 | $15.37 | $47.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: OILER | $21.08 | $9.95 | $31.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $15.70 | $5.86 | $21.56 | $0.00 | $0.00 | $0.00 | $0.00 |