Wage Determination AK20260006-20002-hwy
Peninsula & Lake, AK · highway · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination AK20260006-20002-hwy covers 35 trade classifications for highway construction in Peninsula & Lake, AK. Total packages (base + fringe) range from $64.49/hr to $108.49/hr, with the highest going to LINE CONSTRUCTION: Power Journeyworker Line. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: AK20260006-20002-hwy
Revision: 1
Type: highway
County: Peninsula & Lake
State: AK
Effective: May 17, 2026
Trades covered: 35
Highest rate: $108.49/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $50.79 | $26.32 | $77.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: Inside Journeyman Wireman.$ 53.44 30.52 CARPENTER | $50.79 | $26.86 | $77.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: Fence Barrier Installer | $42.99 | $36.85 | $79.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: Guardrail Installer | $43.99 | $36.85 | $80.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: Guardrail Layout Man | $43.73 | $36.85 | $80.58 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: Signalman, Stage Rigger, Structural, Ornamental, and Reinforcing | $46.49 | $36.85 | $83.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER Group 1 | $40.25 | $34.41 | $74.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER Group 2 | $41.25 | $34.41 | $75.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER Group 3 | $42.15 | $34.41 | $76.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER Group 3A | $46.53 | $34.41 | $80.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER Group 3B | $54.01 | $28.96 | $82.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: Line Installer | $53.53 | $34.54 | $88.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: Powderperson | $70.59 | $35.84 | $106.43 | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: Power Journeyworker Line | $72.59 | $35.90 | $108.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: Tree Trimmer | $42.23 | $30.25 | $72.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER Brush and Roller | $40.33 | $26.17 | $66.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER Brush, Roll, and Spray | $35.97 | $28.52 | $64.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER Sandblast and Spray | $40.85 | $26.17 | $67.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER Sandblast and Structural Steel Painter | $37.32 | $28.52 | $65.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER PERSON: Piledriver, Sheet Stabber | $50.79 | $26.32 | $77.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER PERSON: Piledriver-Welder | $51.79 | $26.32 | $78.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER: First Judicial District | $50.50 | $30.87 | $81.37 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER: North of N 63 Latitude | $51.66 | $32.90 | $84.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER: South of N 63 Latitude | $47.50 | $32.45 | $79.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: Group 1 | $53.23 | $29.40 | $82.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: Group 1A | $55.33 | $29.40 | $84.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: Group 2 | $52.32 | $29.40 | $81.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: Group 3 | $51.46 | $29.40 | $80.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: Group 4 | $44.06 | $29.40 | $73.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: Group 1 | $51.58 | $29.42 | $81.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: Group 1A | $53.05 | $29.42 | $82.47 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: Group 2 | $50.12 | $29.42 | $79.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: Group 3 | $49.17 | $29.42 | $78.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: Group 4 | $48.50 | $29.42 | $77.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: Group 5 | $47.62 | $29.42 | $77.04 | $0.00 | $0.00 | $0.00 | $0.00 |