ZONE DIFFERENTIAL: ZONE 2 = $1.00 ZONE 3 - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT — Prevailing Wage Rates
Davis-Bacon prevailing wages for ZONE DIFFERENTIAL: ZONE 2 = $1.00 ZONE 3 - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFTs across all covered states and counties. Rates vary by location and construction type.
Across 10 Davis-Bacon rate records nationwide, the median total package (base + fringe) for ZONE DIFFERENTIAL: ZONE 2 = $1.00 ZONE 3 - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT is $88.09/hr, with the middle 80% of counties paying between $86.21 and $90.31/hr. The highest state average is Washington at $88.19/hr; the lowest is Washington at $88.19/hr.
Range: $86.21 – $90.31/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
10 county-level rates for ZONE DIFFERENTIAL: ZONE 2 = $1.00 ZONE 3 - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Lewis | WA | building | $58.89 | $27.32 | $86.21 | WD → |
| Lewis | WA | building | $59.56 | $27.32 | $86.88 | WD → |
| Lewis | WA | building | $62.99 | $27.32 | $90.31 | WD → |
| Lewis | WA | building | $62.12 | $27.32 | $89.44 | WD → |
| Lewis | WA | building | $60.32 | $27.32 | $87.64 | WD → |
| Lewis | WA | building | $61.22 | $27.32 | $88.54 | WD → |
| Lewis | WA | heavy | $58.89 | $27.32 | $86.21 | WD → |
| Lewis | WA | heavy | $59.56 | $27.32 | $86.88 | WD → |
| Lewis | WA | heavy | $62.99 | $27.32 | $90.31 | WD → |
| Lewis | WA | heavy | $62.12 | $27.32 | $89.44 | WD → |