TUNNEL, POWER JUMBO SETTING SLIP FORMS, ETC. ZONE DIFFERENTIAL: ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLAC — Prevailing Wage Rates
Davis-Bacon prevailing wages for TUNNEL, POWER JUMBO SETTING SLIP FORMS, ETC. ZONE DIFFERENTIAL: ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACs across all covered states and counties. Rates vary by location and construction type.
Across 1 Davis-Bacon rate records nationwide, the median total package (base + fringe) for TUNNEL, POWER JUMBO SETTING SLIP FORMS, ETC. ZONE DIFFERENTIAL: ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLAC is $68.46/hr, with the middle 80% of counties paying between $68.46 and $68.46/hr. The highest state average is Washington at $68.46/hr; the lowest is Washington at $68.46/hr.
Range: $68.46 – $68.46/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
1 county-level rates for TUNNEL, POWER JUMBO SETTING SLIP FORMS, ETC. ZONE DIFFERENTIAL: ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLAC, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Klickitat | WA | heavy | $51.31 | $17.15 | $68.46 | WD → |