TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM — Prevailing Wage Rates

Davis-Bacon prevailing wages for TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOMs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 72 Davis-Bacon rate records nationwide, the median total package (base + fringe) for TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM is $88.05/hr, with the middle 80% of counties paying between $88.05 and $88.05/hr. The highest state average is Alaska at $88.05/hr; the lowest is Alaska at $88.05/hr.

Bottom 10%
$88.05
Median
$88.05
Average
$88.05
Top 10%
$88.05

Range: $88.05 – $88.05/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Alaska AK
Avg base: $58.55/hr
Avg total: $88.05/hr
72 rates

All Rates

72 county-level rates for TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Aleutians West AK residential $58.55 $29.50 $88.05 WD →
Aleutians West AK heavy $58.55 $29.50 $88.05 WD →
Aleutians West AK building $58.55 $29.50 $88.05 WD →
Anchorage AK heavy $58.55 $29.50 $88.05 WD →
Anchorage AK building $58.55 $29.50 $88.05 WD →
Bethel AK heavy $58.55 $29.50 $88.05 WD →
Bethel AK building $58.55 $29.50 $88.05 WD →
Bethel AK residential $58.55 $29.50 $88.05 WD →
Bristol Bay AK building $58.55 $29.50 $88.05 WD →
Bristol Bay AK heavy $58.55 $29.50 $88.05 WD →
Bristol Bay AK residential $58.55 $29.50 $88.05 WD →
Denali AK heavy $58.55 $29.50 $88.05 WD →
Denali AK building $58.55 $29.50 $88.05 WD →
Dillingham AK building $58.55 $29.50 $88.05 WD →
Dillingham AK heavy $58.55 $29.50 $88.05 WD →
Dillingham AK residential $58.55 $29.50 $88.05 WD →
Fairbanks North Star AK heavy $58.55 $29.50 $88.05 WD →
Fairbanks North Star AK building $58.55 $29.50 $88.05 WD →
Haines AK residential $58.55 $29.50 $88.05 WD →
Haines AK heavy $58.55 $29.50 $88.05 WD →
Haines AK building $58.55 $29.50 $88.05 WD →
Juneau AK residential $58.55 $29.50 $88.05 WD →
Juneau AK building $58.55 $29.50 $88.05 WD →
Juneau AK heavy $58.55 $29.50 $88.05 WD →
Kenai Peninsula AK residential $58.55 $29.50 $88.05 WD →
Kenai Peninsula AK heavy $58.55 $29.50 $88.05 WD →
Kenai Peninsula AK building $58.55 $29.50 $88.05 WD →
Ketchikan Gateway AK residential $58.55 $29.50 $88.05 WD →
Ketchikan Gateway AK building $58.55 $29.50 $88.05 WD →
Ketchikan Gateway AK heavy $58.55 $29.50 $88.05 WD →
Kodiak Island AK residential $58.55 $29.50 $88.05 WD →
Kodiak Island AK building $58.55 $29.50 $88.05 WD →
Kodiak Island AK heavy $58.55 $29.50 $88.05 WD →
Matanuska-Susitna AK building $58.55 $29.50 $88.05 WD →
Matanuska-Susitna AK building $58.55 $29.50 $88.05 WD →
Matanuska-Susitna AK residential $58.55 $29.50 $88.05 WD →
Matanuska-Susitna AK heavy $58.55 $29.50 $88.05 WD →
Matanuska-Susitna AK residential $58.55 $29.50 $88.05 WD →
Matanuska-Susitna AK heavy $58.55 $29.50 $88.05 WD →
Nome AK building $58.55 $29.50 $88.05 WD →
Nome AK heavy $58.55 $29.50 $88.05 WD →
North Slope AK building $58.55 $29.50 $88.05 WD →
North Slope AK heavy $58.55 $29.50 $88.05 WD →
Northwest Artic AK building $58.55 $29.50 $88.05 WD →
Northwest Artic AK heavy $58.55 $29.50 $88.05 WD →
Peninsula & Lake AK building $58.55 $29.50 $88.05 WD →
Peninsula & Lake AK heavy $58.55 $29.50 $88.05 WD →
Peninsula & Lake AK residential $58.55 $29.50 $88.05 WD →
Prince Of Wales-Outer Ketchika AK heavy $58.55 $29.50 $88.05 WD →
Prince Of Wales-Outer Ketchika AK building $58.55 $29.50 $88.05 WD →
Prince Of Wales-Outer Ketchika AK residential $58.55 $29.50 $88.05 WD →
Sitka AK building $58.55 $29.50 $88.05 WD →
Sitka AK residential $58.55 $29.50 $88.05 WD →
Sitka AK heavy $58.55 $29.50 $88.05 WD →
Skagway-Yakutat-Angoon AK heavy $58.55 $29.50 $88.05 WD →
Skagway-Yakutat-Angoon AK residential $58.55 $29.50 $88.05 WD →
Skagway-Yakutat-Angoon AK building $58.55 $29.50 $88.05 WD →
Southeast Fairbanks AK heavy $58.55 $29.50 $88.05 WD →
Southeast Fairbanks AK building $58.55 $29.50 $88.05 WD →
Southeast Fairbanks AK building $58.55 $29.50 $88.05 WD →
Southeast Fairbanks AK heavy $58.55 $29.50 $88.05 WD →
Valdez-Cordova AK residential $58.55 $29.50 $88.05 WD →
Valdez-Cordova AK heavy $58.55 $29.50 $88.05 WD →
Valdez-Cordova AK building $58.55 $29.50 $88.05 WD →
Wade Hampton AK building $58.55 $29.50 $88.05 WD →
Wade Hampton AK heavy $58.55 $29.50 $88.05 WD →
Wade Hampton AK residential $58.55 $29.50 $88.05 WD →
Wrangell-Petersburg AK residential $58.55 $29.50 $88.05 WD →
Wrangell-Petersburg AK heavy $58.55 $29.50 $88.05 WD →
Wrangell-Petersburg AK building $58.55 $29.50 $88.05 WD →
Yukon-Koyukuk AK heavy $58.55 $29.50 $88.05 WD →
Yukon-Koyukuk AK building $58.55 $29.50 $88.05 WD →
Top-paying counties for TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM →