TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 2 DRIVERS ON TANDEM AXLE EIGHTEEN CU.YDS. OR TWENTY- FOUR TONS GROSS, SIX WHEEL TRUCKS, KOEHRING OR SI — Prevailing Wage Rates
Davis-Bacon prevailing wages for TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 2 DRIVERS ON TANDEM AXLE EIGHTEEN CU.YDS. OR TWENTY- FOUR TONS GROSS, SIX WHEEL TRUCKS, KOEHRING OR SIs across all covered states and counties. Rates vary by location and construction type.
Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 2 DRIVERS ON TANDEM AXLE EIGHTEEN CU.YDS. OR TWENTY- FOUR TONS GROSS, SIX WHEEL TRUCKS, KOEHRING OR SI is $33.17/hr, with the middle 80% of counties paying between $33.17 and $33.17/hr. The highest state average is Indiana at $33.17/hr; the lowest is Indiana at $33.17/hr.
Range: $33.17 – $33.17/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 53-3032 — Heavy and Tractor-Trailer Truck Drivers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
15 county-level rates for TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 2 DRIVERS ON TANDEM AXLE EIGHTEEN CU.YDS. OR TWENTY- FOUR TONS GROSS, SIX WHEEL TRUCKS, KOEHRING OR SI, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| La Porte | IN | building | $33.17 | $0.00 | $33.17 | WD → |
| La Porte | IN | highway | $33.17 | $0.00 | $33.17 | WD → |
| La Porte | IN | heavy | $33.17 | $0.00 | $33.17 | WD → |
| Lake | IN | heavy | $33.17 | $0.00 | $33.17 | WD → |
| Lake | IN | building | $33.17 | $0.00 | $33.17 | WD → |
| Lake | IN | highway | $33.17 | $0.00 | $33.17 | WD → |
| Porter | IN | heavy | $33.17 | $0.00 | $33.17 | WD → |
| Porter | IN | building | $33.17 | $0.00 | $33.17 | WD → |
| Porter | IN | highway | $33.17 | $0.00 | $33.17 | WD → |
| St Joseph | IN | heavy | $33.17 | $0.00 | $33.17 | WD → |
| St Joseph | IN | building | $33.17 | $0.00 | $33.17 | WD → |
| St Joseph | IN | building | $33.17 | $0.00 | $33.17 | WD → |
| St Joseph | IN | highway | $33.17 | $0.00 | $33.17 | WD → |
| St Joseph | IN | highway | $33.17 | $0.00 | $33.17 | WD → |
| St Joseph | IN | heavy | $33.17 | $0.00 | $33.17 | WD → |