TON OR MORE CAPACITY) 95% OF J.L. RATE (LAKE & PORTER COUNTIES) — Prevailing Wage Rates

Davis-Bacon prevailing wages for TON OR MORE CAPACITY) 95% OF J.L. RATE (LAKE & PORTER COUNTIES)s across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for TON OR MORE CAPACITY) 95% OF J.L. RATE (LAKE & PORTER COUNTIES) is $68.88/hr, with the middle 80% of counties paying between $68.88 and $68.88/hr. The highest state average is Indiana at $68.88/hr; the lowest is Indiana at $68.88/hr.

Bottom 10%
$68.88
Median
$68.88
Average
$68.88
Top 10%
$68.88

Range: $68.88 – $68.88/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Indiana IN
Avg base: $47.35/hr
Avg total: $68.88/hr
15 rates

All Rates

15 county-level rates for TON OR MORE CAPACITY) 95% OF J.L. RATE (LAKE & PORTER COUNTIES), ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
La Porte IN building $47.35 $21.53 $68.88 WD →
La Porte IN highway $47.35 $21.53 $68.88 WD →
La Porte IN heavy $47.35 $21.53 $68.88 WD →
Lake IN heavy $47.35 $21.53 $68.88 WD →
Lake IN building $47.35 $21.53 $68.88 WD →
Lake IN highway $47.35 $21.53 $68.88 WD →
Porter IN heavy $47.35 $21.53 $68.88 WD →
Porter IN building $47.35 $21.53 $68.88 WD →
Porter IN highway $47.35 $21.53 $68.88 WD →
St Joseph IN heavy $47.35 $21.53 $68.88 WD →
St Joseph IN building $47.35 $21.53 $68.88 WD →
St Joseph IN building $47.35 $21.53 $68.88 WD →
St Joseph IN highway $47.35 $21.53 $68.88 WD →
St Joseph IN highway $47.35 $21.53 $68.88 WD →
St Joseph IN heavy $47.35 $21.53 $68.88 WD →
Top-paying counties for TON OR MORE CAPACITY) 95% OF J.L. RATE (LAKE & PORTER COUNTIES) →