TON OR MORE CAPACITY) 95% OF J.L. RATE (LAKE & PORTER COUNTIES) — Prevailing Wage Rates
Davis-Bacon prevailing wages for TON OR MORE CAPACITY) 95% OF J.L. RATE (LAKE & PORTER COUNTIES)s across all covered states and counties. Rates vary by location and construction type.
Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for TON OR MORE CAPACITY) 95% OF J.L. RATE (LAKE & PORTER COUNTIES) is $68.88/hr, with the middle 80% of counties paying between $68.88 and $68.88/hr. The highest state average is Indiana at $68.88/hr; the lowest is Indiana at $68.88/hr.
Range: $68.88 – $68.88/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
15 county-level rates for TON OR MORE CAPACITY) 95% OF J.L. RATE (LAKE & PORTER COUNTIES), ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| La Porte | IN | building | $47.35 | $21.53 | $68.88 | WD → |
| La Porte | IN | highway | $47.35 | $21.53 | $68.88 | WD → |
| La Porte | IN | heavy | $47.35 | $21.53 | $68.88 | WD → |
| Lake | IN | heavy | $47.35 | $21.53 | $68.88 | WD → |
| Lake | IN | building | $47.35 | $21.53 | $68.88 | WD → |
| Lake | IN | highway | $47.35 | $21.53 | $68.88 | WD → |
| Porter | IN | heavy | $47.35 | $21.53 | $68.88 | WD → |
| Porter | IN | building | $47.35 | $21.53 | $68.88 | WD → |
| Porter | IN | highway | $47.35 | $21.53 | $68.88 | WD → |
| St Joseph | IN | heavy | $47.35 | $21.53 | $68.88 | WD → |
| St Joseph | IN | building | $47.35 | $21.53 | $68.88 | WD → |
| St Joseph | IN | building | $47.35 | $21.53 | $68.88 | WD → |
| St Joseph | IN | highway | $47.35 | $21.53 | $68.88 | WD → |
| St Joseph | IN | highway | $47.35 | $21.53 | $68.88 | WD → |
| St Joseph | IN | heavy | $47.35 | $21.53 | $68.88 | WD → |