TILT MAST), GREASER ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD BUCKET AND UNDER, HOISTS, HYDRULIC BOOM TRUCK, POST HOLE DIGGER, PUMP CRETES (SQ — Prevailing Wage Rates

Davis-Bacon prevailing wages for TILT MAST), GREASER ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD BUCKET AND UNDER, HOISTS, HYDRULIC BOOM TRUCK, POST HOLE DIGGER, PUMP CRETES (SQs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 38 Davis-Bacon rate records nationwide, the median total package (base + fringe) for TILT MAST), GREASER ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD BUCKET AND UNDER, HOISTS, HYDRULIC BOOM TRUCK, POST HOLE DIGGER, PUMP CRETES (SQ is $73.45/hr, with the middle 80% of counties paying between $73.45 and $73.45/hr. The highest state average is Indiana at $73.45/hr; the lowest is Indiana at $73.45/hr.

Bottom 10%
$73.45
Median
$73.45
Average
$73.45
Top 10%
$73.45

Range: $73.45 – $73.45/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Indiana IN
Avg base: $34.80/hr
Avg total: $73.45/hr
38 rates

All Rates

38 county-level rates for TILT MAST), GREASER ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD BUCKET AND UNDER, HOISTS, HYDRULIC BOOM TRUCK, POST HOLE DIGGER, PUMP CRETES (SQ, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adams IN building $34.80 $38.65 $73.45 WD →
Allen IN building $34.80 $38.65 $73.45 WD →
Bartholomew IN building $34.80 $38.65 $73.45 WD →
Benton IN building $34.80 $38.65 $73.45 WD →
Blackford IN building $34.80 $38.65 $73.45 WD →
Boone IN building $34.80 $38.65 $73.45 WD →
Carroll IN building $34.80 $38.65 $73.45 WD →
Cass IN building $34.80 $38.65 $73.45 WD →
Clinton IN building $34.80 $38.65 $73.45 WD →
DeKalb IN building $34.80 $38.65 $73.45 WD →
DeKalb IN building $34.80 $38.65 $73.45 WD →
Delaware IN building $34.80 $38.65 $73.45 WD →
Fountain IN building $34.80 $38.65 $73.45 WD →
Fulton IN building $34.80 $38.65 $73.45 WD →
Grant IN building $34.80 $38.65 $73.45 WD →
Hamilton IN building $34.80 $38.65 $73.45 WD →
Hancock IN building $34.80 $38.65 $73.45 WD →
Hendricks IN building $34.80 $38.65 $73.45 WD →
Howard IN building $34.80 $38.65 $73.45 WD →
Huntington IN building $34.80 $38.65 $73.45 WD →
Jay IN building $34.80 $38.65 $73.45 WD →
Johnson IN building $34.80 $38.65 $73.45 WD →
Madison IN building $34.80 $38.65 $73.45 WD →
Marion IN building $34.80 $38.65 $73.45 WD →
Miami IN building $34.80 $38.65 $73.45 WD →
Monroe IN building $34.80 $38.65 $73.45 WD →
Montgomery IN building $34.80 $38.65 $73.45 WD →
Morgan IN building $34.80 $38.65 $73.45 WD →
Noble IN building $34.80 $38.65 $73.45 WD →
Shelby IN building $34.80 $38.65 $73.45 WD →
Steuben IN building $34.80 $38.65 $73.45 WD →
Tippecanoe IN building $34.80 $38.65 $73.45 WD →
Tipton IN building $34.80 $38.65 $73.45 WD →
Wabash IN building $34.80 $38.65 $73.45 WD →
Warren IN building $34.80 $38.65 $73.45 WD →
Wells IN building $34.80 $38.65 $73.45 WD →
White IN building $34.80 $38.65 $73.45 WD →
Whitley IN building $34.80 $38.65 $73.45 WD →
Top-paying counties for TILT MAST), GREASER ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD BUCKET AND UNDER, HOISTS, HYDRULIC BOOM TRUCK, POST HOLE DIGGER, PUMP CRETES (SQ →