THROTTLE VALVE, CONCRETE BREAKER, CONCRETE MIXER, FORKLIFT, GREASER ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD BUCKET AND UNDER, HOISTS, HYDRUL — Prevailing Wage Rates
Davis-Bacon prevailing wages for THROTTLE VALVE, CONCRETE BREAKER, CONCRETE MIXER, FORKLIFT, GREASER ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD BUCKET AND UNDER, HOISTS, HYDRULs across all covered states and counties. Rates vary by location and construction type.
Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for THROTTLE VALVE, CONCRETE BREAKER, CONCRETE MIXER, FORKLIFT, GREASER ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD BUCKET AND UNDER, HOISTS, HYDRUL is $73.45/hr, with the middle 80% of counties paying between $73.45 and $73.45/hr. The highest state average is Indiana at $73.45/hr; the lowest is Indiana at $73.45/hr.
Range: $73.45 – $73.45/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
15 county-level rates for THROTTLE VALVE, CONCRETE BREAKER, CONCRETE MIXER, FORKLIFT, GREASER ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD BUCKET AND UNDER, HOISTS, HYDRUL, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| La Porte | IN | building | $34.80 | $38.65 | $73.45 | WD → |
| La Porte | IN | highway | $34.80 | $38.65 | $73.45 | WD → |
| La Porte | IN | heavy | $34.80 | $38.65 | $73.45 | WD → |
| Lake | IN | heavy | $34.80 | $38.65 | $73.45 | WD → |
| Lake | IN | building | $34.80 | $38.65 | $73.45 | WD → |
| Lake | IN | highway | $34.80 | $38.65 | $73.45 | WD → |
| Porter | IN | heavy | $34.80 | $38.65 | $73.45 | WD → |
| Porter | IN | building | $34.80 | $38.65 | $73.45 | WD → |
| Porter | IN | highway | $34.80 | $38.65 | $73.45 | WD → |
| St Joseph | IN | heavy | $34.80 | $38.65 | $73.45 | WD → |
| St Joseph | IN | building | $34.80 | $38.65 | $73.45 | WD → |
| St Joseph | IN | building | $34.80 | $38.65 | $73.45 | WD → |
| St Joseph | IN | highway | $34.80 | $38.65 | $73.45 | WD → |
| St Joseph | IN | highway | $34.80 | $38.65 | $73.45 | WD → |
| St Joseph | IN | heavy | $34.80 | $38.65 | $73.45 | WD → |