THROTTLE VALVE, CONCRETE BREAKER, CONCRETE MIXER, FORKLIFT, GREASER ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD BUCKET AND UNDER, HOISTS, HYDRUL — Prevailing Wage Rates

Davis-Bacon prevailing wages for THROTTLE VALVE, CONCRETE BREAKER, CONCRETE MIXER, FORKLIFT, GREASER ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD BUCKET AND UNDER, HOISTS, HYDRULs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for THROTTLE VALVE, CONCRETE BREAKER, CONCRETE MIXER, FORKLIFT, GREASER ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD BUCKET AND UNDER, HOISTS, HYDRUL is $73.45/hr, with the middle 80% of counties paying between $73.45 and $73.45/hr. The highest state average is Indiana at $73.45/hr; the lowest is Indiana at $73.45/hr.

Bottom 10%
$73.45
Median
$73.45
Average
$73.45
Top 10%
$73.45

Range: $73.45 – $73.45/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Indiana IN
Avg base: $34.80/hr
Avg total: $73.45/hr
15 rates

All Rates

15 county-level rates for THROTTLE VALVE, CONCRETE BREAKER, CONCRETE MIXER, FORKLIFT, GREASER ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD BUCKET AND UNDER, HOISTS, HYDRUL, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
La Porte IN building $34.80 $38.65 $73.45 WD →
La Porte IN highway $34.80 $38.65 $73.45 WD →
La Porte IN heavy $34.80 $38.65 $73.45 WD →
Lake IN heavy $34.80 $38.65 $73.45 WD →
Lake IN building $34.80 $38.65 $73.45 WD →
Lake IN highway $34.80 $38.65 $73.45 WD →
Porter IN heavy $34.80 $38.65 $73.45 WD →
Porter IN building $34.80 $38.65 $73.45 WD →
Porter IN highway $34.80 $38.65 $73.45 WD →
St Joseph IN heavy $34.80 $38.65 $73.45 WD →
St Joseph IN building $34.80 $38.65 $73.45 WD →
St Joseph IN building $34.80 $38.65 $73.45 WD →
St Joseph IN highway $34.80 $38.65 $73.45 WD →
St Joseph IN highway $34.80 $38.65 $73.45 WD →
St Joseph IN heavy $34.80 $38.65 $73.45 WD →
Top-paying counties for THROTTLE VALVE, CONCRETE BREAKER, CONCRETE MIXER, FORKLIFT, GREASER ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD BUCKET AND UNDER, HOISTS, HYDRUL →