TELECOMMUNICATION TECHNICIAN - WORK COVERS LOW VOLTAGE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES INCLUDING, TELEPHONE AND — Prevailing Wage Rates
Davis-Bacon prevailing wages for TELECOMMUNICATION TECHNICIAN - WORK COVERS LOW VOLTAGE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES INCLUDING, TELEPHONE ANDs across all covered states and counties. Rates vary by location and construction type.
Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for TELECOMMUNICATION TECHNICIAN - WORK COVERS LOW VOLTAGE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES INCLUDING, TELEPHONE AND is $72.73/hr, with the middle 80% of counties paying between $72.73 and $72.73/hr. The highest state average is Indiana at $72.73/hr; the lowest is Indiana at $72.73/hr.
Range: $72.73 – $72.73/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
15 county-level rates for TELECOMMUNICATION TECHNICIAN - WORK COVERS LOW VOLTAGE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES INCLUDING, TELEPHONE AND, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| La Porte | IN | building | $41.50 | $31.23 | $72.73 | WD → |
| La Porte | IN | highway | $41.50 | $31.23 | $72.73 | WD → |
| La Porte | IN | heavy | $41.50 | $31.23 | $72.73 | WD → |
| Lake | IN | heavy | $41.50 | $31.23 | $72.73 | WD → |
| Lake | IN | building | $41.50 | $31.23 | $72.73 | WD → |
| Lake | IN | highway | $41.50 | $31.23 | $72.73 | WD → |
| Porter | IN | heavy | $41.50 | $31.23 | $72.73 | WD → |
| Porter | IN | building | $41.50 | $31.23 | $72.73 | WD → |
| Porter | IN | highway | $41.50 | $31.23 | $72.73 | WD → |
| St Joseph | IN | heavy | $41.50 | $31.23 | $72.73 | WD → |
| St Joseph | IN | building | $41.50 | $31.23 | $72.73 | WD → |
| St Joseph | IN | building | $41.50 | $31.23 | $72.73 | WD → |
| St Joseph | IN | highway | $41.50 | $31.23 | $72.73 | WD → |
| St Joseph | IN | highway | $41.50 | $31.23 | $72.73 | WD → |
| St Joseph | IN | heavy | $41.50 | $31.23 | $72.73 | WD → |