SHEET METAL WORKER, Includes HVAC Unit Installation — Prevailing Wage Rates
Davis-Bacon prevailing wages for SHEET METAL WORKER, Includes HVAC Unit Installations across all covered states and counties. Rates vary by location and construction type.
Across 14 Davis-Bacon rate records nationwide, the median total package (base + fringe) for SHEET METAL WORKER, Includes HVAC Unit Installation is $78.16/hr, with the middle 80% of counties paying between $78.16 and $78.16/hr. The highest state average is Oregon at $78.16/hr; the lowest is Oregon at $78.16/hr.
Range: $78.16 – $78.16/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2211 — Sheet Metal Workers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
14 county-level rates for SHEET METAL WORKER, Includes HVAC Unit Installation, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Baker | OR | building | $47.76 | $30.40 | $78.16 | WD → |
| Gilliam | OR | building | $47.76 | $30.40 | $78.16 | WD → |
| Grant | OR | building | $47.76 | $30.40 | $78.16 | WD → |
| Harney | OR | building | $47.76 | $30.40 | $78.16 | WD → |
| Jefferson | OR | building | $47.76 | $30.40 | $78.16 | WD → |
| Klamath | OR | building | $47.76 | $30.40 | $78.16 | WD → |
| Lake | OR | building | $47.76 | $30.40 | $78.16 | WD → |
| Malheur | OR | building | $47.76 | $30.40 | $78.16 | WD → |
| Morrow | OR | building | $47.76 | $30.40 | $78.16 | WD → |
| Sherman | OR | building | $47.76 | $30.40 | $78.16 | WD → |
| Umatilla | OR | building | $47.76 | $30.40 | $78.16 | WD → |
| Union | OR | building | $47.76 | $30.40 | $78.16 | WD → |
| Wallowa | OR | building | $47.76 | $30.40 | $78.16 | WD → |
| Wheeler | OR | building | $47.76 | $30.40 | $78.16 | WD → |