SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 19.67 0.68 PLUMBER — Prevailing Wage Rates
Davis-Bacon prevailing wages for SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 19.67 0.68 PLUMBERs across all covered states and counties. Rates vary by location and construction type.
Across 17 Davis-Bacon rate records nationwide, the median total package (base + fringe) for SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 19.67 0.68 PLUMBER is $20.38/hr, with the middle 80% of counties paying between $20.38 and $20.38/hr. The highest state average is Mississippi at $20.60/hr; the lowest is Mississippi at $20.60/hr.
Range: $20.38 – $24.14/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2211 — Sheet Metal Workers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
17 county-level rates for SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 19.67 0.68 PLUMBER, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Adams | MS | building | $20.00 | $0.38 | $20.38 | WD → |
| Amite | MS | building | $20.00 | $0.38 | $20.38 | WD → |
| Claiborne | MS | building | $20.00 | $0.38 | $20.38 | WD → |
| Covington | MS | building | $20.00 | $0.38 | $20.38 | WD → |
| Franklin | MS | building | $20.00 | $0.38 | $20.38 | WD → |
| Issaquena | MS | building | $20.00 | $0.38 | $20.38 | WD → |
| Jefferson | MS | building | $20.00 | $0.38 | $20.38 | WD → |
| Jefferson Davis | MS | building | $20.00 | $0.38 | $20.38 | WD → |
| Lawrence | MS | building | $20.00 | $0.38 | $20.38 | WD → |
| Lincoln | MS | building | $20.00 | $0.38 | $20.38 | WD → |
| Marion | MS | building | $20.00 | $0.38 | $20.38 | WD → |
| Pike | MS | building | $20.00 | $0.38 | $20.38 | WD → |
| Sharkey | MS | building | $20.00 | $0.38 | $20.38 | WD → |
| Walthall | MS | building | $20.00 | $0.38 | $20.38 | WD → |
| Warren | MS | building | $20.00 | $0.38 | $20.38 | WD → |
| Wilkinson | MS | building | $19.82 | $4.32 | $24.14 | WD → |
| Yazoo | MS | building | $20.00 | $0.38 | $20.38 | WD → |