SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 18.00 0.00 ROOFER — Prevailing Wage Rates

Davis-Bacon prevailing wages for SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 18.00 0.00 ROOFERs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 24 Davis-Bacon rate records nationwide, the median total package (base + fringe) for SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 18.00 0.00 ROOFER is $16.39/hr, with the middle 80% of counties paying between $16.39 and $16.39/hr. The highest state average is Texas at $16.39/hr; the lowest is Texas at $16.39/hr.

Bottom 10%
$16.39
Median
$16.39
Average
$16.39
Top 10%
$16.39

Range: $16.39 – $16.39/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2211Sheet Metal Workers.

Davis-Bacon median
$16.39/hr
National median total package (base + fringe)
BLS OEWS market median
$29.26/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
-44%
D-B rate is below market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Texas TX
Avg base: $15.10/hr
Avg total: $16.39/hr
24 rates

All Rates

24 county-level rates for SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 18.00 0.00 ROOFER, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Andrews TX building $15.10 $1.29 $16.39 WD →
Borden TX building $15.10 $1.29 $16.39 WD →
Brewster TX building $15.10 $1.29 $16.39 WD →
Crane TX building $15.10 $1.29 $16.39 WD →
Crockett TX building $15.10 $1.29 $16.39 WD →
Culberson TX building $15.10 $1.29 $16.39 WD →
Dawson TX building $15.10 $1.29 $16.39 WD →
Edwards TX building $15.10 $1.29 $16.39 WD →
Gaines TX building $15.10 $1.29 $16.39 WD →
Glasscock TX building $15.10 $1.29 $16.39 WD →
Howard TX building $15.10 $1.29 $16.39 WD →
Hudspeth TX building $15.10 $1.29 $16.39 WD →
Jeff Davis TX building $15.10 $1.29 $16.39 WD →
Loving TX building $15.10 $1.29 $16.39 WD →
Martin TX building $15.10 $1.29 $16.39 WD →
Pecos TX building $15.10 $1.29 $16.39 WD →
Presidio TX building $15.10 $1.29 $16.39 WD →
Reagan TX building $15.10 $1.29 $16.39 WD →
Reeves TX building $15.10 $1.29 $16.39 WD →
Sutton TX building $15.10 $1.29 $16.39 WD →
Terrell TX building $15.10 $1.29 $16.39 WD →
Upton TX building $15.10 $1.29 $16.39 WD →
Ward TX building $15.10 $1.29 $16.39 WD →
Winkler TX building $15.10 $1.29 $16.39 WD →
Top-paying counties for SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 18.00 0.00 ROOFER →