SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 20.66 0.00 ROOFER — Prevailing Wage Rates

Davis-Bacon prevailing wages for SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 20.66 0.00 ROOFERs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 11 Davis-Bacon rate records nationwide, the median total package (base + fringe) for SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 20.66 0.00 ROOFER is $22.43/hr, with the middle 80% of counties paying between $22.43 and $22.43/hr. The highest state average is Louisiana at $22.43/hr; the lowest is Louisiana at $22.43/hr.

Bottom 10%
$22.43
Median
$22.43
Average
$22.43
Top 10%
$22.43

Range: $22.43 – $22.43/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2211Sheet Metal Workers.

Davis-Bacon median
$22.43/hr
National median total package (base + fringe)
BLS OEWS market median
$29.26/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
-23.3%
D-B rate is below market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Louisiana LA
Avg base: $16.77/hr
Avg total: $22.43/hr
11 rates

All Rates

11 county-level rates for SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 20.66 0.00 ROOFER, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Lafourche LA building $16.77 $5.66 $22.43 WD →
Plaquemines LA building $16.77 $5.66 $22.43 WD →
St Bernard LA building $16.77 $5.66 $22.43 WD →
St Charles LA building $16.77 $5.66 $22.43 WD →
St James LA building $16.77 $5.66 $22.43 WD →
St James LA building $16.77 $5.66 $22.43 WD →
St John the Baptist LA building $16.77 $5.66 $22.43 WD →
St John the Baptist LA building $16.77 $5.66 $22.43 WD →
St Tammany LA building $16.77 $5.66 $22.43 WD →
Tangipahoa LA building $16.77 $5.66 $22.43 WD →
Terrebonne LA building $16.77 $5.66 $22.43 WD →
Top-paying counties for SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 20.66 0.00 ROOFER →