SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 19.67 13.27 ROOFER — Prevailing Wage Rates
Davis-Bacon prevailing wages for SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 19.67 13.27 ROOFERs across all covered states and counties. Rates vary by location and construction type.
Across 11 Davis-Bacon rate records nationwide, the median total package (base + fringe) for SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 19.67 13.27 ROOFER is $22.64/hr, with the middle 80% of counties paying between $22.64 and $22.64/hr. The highest state average is North Carolina at $22.64/hr; the lowest is North Carolina at $22.64/hr.
Range: $22.64 – $22.64/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2211 — Sheet Metal Workers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
11 county-level rates for SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 19.67 13.27 ROOFER, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Alexander | NC | building | $18.26 | $4.38 | $22.64 | WD → |
| Burke | NC | building | $18.26 | $4.38 | $22.64 | WD → |
| Cabarrus | NC | building | $18.26 | $4.38 | $22.64 | WD → |
| Caldwell | NC | building | $18.26 | $4.38 | $22.64 | WD → |
| Catawba | NC | building | $18.26 | $4.38 | $22.64 | WD → |
| Gaston | NC | building | $18.26 | $4.38 | $22.64 | WD → |
| Iredell | NC | building | $18.26 | $4.38 | $22.64 | WD → |
| Lincoln | NC | building | $18.26 | $4.38 | $22.64 | WD → |
| Mecklenburg | NC | building | $18.26 | $4.38 | $22.64 | WD → |
| Rowan | NC | building | $18.26 | $4.38 | $22.64 | WD → |
| Union | NC | building | $18.26 | $4.38 | $22.64 | WD → |