RECEIVER); ASPHALT SPREADER; BOILERS; BULLDOZERS; COMBINATION BACKHOE END LOADER WITH BACKHOE BUCKET 1/2 CU. YD. AND UNDER OR WITH ATTACHMENTS; CORBOY — Prevailing Wage Rates
Davis-Bacon prevailing wages for RECEIVER); ASPHALT SPREADER; BOILERS; BULLDOZERS; COMBINATION BACKHOE END LOADER WITH BACKHOE BUCKET 1/2 CU. YD. AND UNDER OR WITH ATTACHMENTS; CORBOYs across all covered states and counties. Rates vary by location and construction type.
Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for RECEIVER); ASPHALT SPREADER; BOILERS; BULLDOZERS; COMBINATION BACKHOE END LOADER WITH BACKHOE BUCKET 1/2 CU. YD. AND UNDER OR WITH ATTACHMENTS; CORBOY is $93.83/hr, with the middle 80% of counties paying between $93.83 and $93.83/hr. The highest state average is Indiana at $93.83/hr; the lowest is Indiana at $93.83/hr.
Range: $93.83 – $93.83/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
15 county-level rates for RECEIVER); ASPHALT SPREADER; BOILERS; BULLDOZERS; COMBINATION BACKHOE END LOADER WITH BACKHOE BUCKET 1/2 CU. YD. AND UNDER OR WITH ATTACHMENTS; CORBOY, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| La Porte | IN | building | $47.90 | $45.93 | $93.83 | WD → |
| La Porte | IN | highway | $47.90 | $45.93 | $93.83 | WD → |
| La Porte | IN | heavy | $47.90 | $45.93 | $93.83 | WD → |
| Lake | IN | heavy | $47.90 | $45.93 | $93.83 | WD → |
| Lake | IN | building | $47.90 | $45.93 | $93.83 | WD → |
| Lake | IN | highway | $47.90 | $45.93 | $93.83 | WD → |
| Porter | IN | heavy | $47.90 | $45.93 | $93.83 | WD → |
| Porter | IN | building | $47.90 | $45.93 | $93.83 | WD → |
| Porter | IN | highway | $47.90 | $45.93 | $93.83 | WD → |
| St Joseph | IN | heavy | $47.90 | $45.93 | $93.83 | WD → |
| St Joseph | IN | building | $47.90 | $45.93 | $93.83 | WD → |
| St Joseph | IN | building | $47.90 | $45.93 | $93.83 | WD → |
| St Joseph | IN | highway | $47.90 | $45.93 | $93.83 | WD → |
| St Joseph | IN | highway | $47.90 | $45.93 | $93.83 | WD → |
| St Joseph | IN | heavy | $47.90 | $45.93 | $93.83 | WD → |