POWER EQUIPMENT OPERATORS: GROUP A CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TR — Prevailing Wage Rates
Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATORS: GROUP A CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRs across all covered states and counties. Rates vary by location and construction type.
Across 14 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATORS: GROUP A CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TR is $84.51/hr, with the middle 80% of counties paying between $84.51 and $88.62/hr. The highest state average is New York at $85.98/hr; the lowest is New York at $85.98/hr.
Range: $84.51 – $88.62/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073 — Operating Engineers and Other Construction Equipment Operators.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
14 county-level rates for POWER EQUIPMENT OPERATORS: GROUP A CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TR, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Broome | NY | highway | $51.71 | $32.80 | $84.51 | WD → |
| Broome | NY | building | $51.71 | $32.80 | $84.51 | WD → |
| Broome | NY | heavy | $51.71 | $32.80 | $84.51 | WD → |
| Chenango | NY | heavy | $51.71 | $32.80 | $84.51 | WD → |
| Chenango | NY | highway | $51.71 | $32.80 | $84.51 | WD → |
| Chenango | NY | building | $51.71 | $32.80 | $84.51 | WD → |
| Hamilton | NY | highway | $55.42 | $33.20 | $88.62 | WD → |
| Hamilton | NY | heavy | $55.42 | $33.20 | $88.62 | WD → |
| Tioga | NY | building | $51.71 | $32.80 | $84.51 | WD → |
| Tioga | NY | heavy | $51.71 | $32.80 | $84.51 | WD → |
| Tioga | NY | highway | $51.71 | $32.80 | $84.51 | WD → |
| Warren | NY | heavy | $55.42 | $33.20 | $88.62 | WD → |
| Warren | NY | building | $55.42 | $33.20 | $88.62 | WD → |
| Warren | NY | highway | $55.42 | $33.20 | $88.62 | WD → |