POWER EQUIPMENT OPERATORS: GROUP 4 AIR COMPRESSOR, BITUMINOUS DISTRIBUTOR, CEMENT GUN, CONCRETE SAW, CONVEYOR, DECK HAND OILER, EARTH ROLLER, FORM GRA — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATORS: GROUP 4 AIR COMPRESSOR, BITUMINOUS DISTRIBUTOR, CEMENT GUN, CONCRETE SAW, CONVEYOR, DECK HAND OILER, EARTH ROLLER, FORM GRAs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 38 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATORS: GROUP 4 AIR COMPRESSOR, BITUMINOUS DISTRIBUTOR, CEMENT GUN, CONCRETE SAW, CONVEYOR, DECK HAND OILER, EARTH ROLLER, FORM GRA is $54.38/hr, with the middle 80% of counties paying between $54.38 and $54.38/hr. The highest state average is Indiana at $54.38/hr; the lowest is Indiana at $54.38/hr.

Bottom 10%
$54.38
Median
$54.38
Average
$54.38
Top 10%
$54.38

Range: $54.38 – $54.38/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$54.38/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+92.6%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Indiana IN
Avg base: $30.43/hr
Avg total: $54.38/hr
38 rates

All Rates

38 county-level rates for POWER EQUIPMENT OPERATORS: GROUP 4 AIR COMPRESSOR, BITUMINOUS DISTRIBUTOR, CEMENT GUN, CONCRETE SAW, CONVEYOR, DECK HAND OILER, EARTH ROLLER, FORM GRA, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adams IN building $30.43 $23.95 $54.38 WD →
Allen IN building $30.43 $23.95 $54.38 WD →
Bartholomew IN building $30.43 $23.95 $54.38 WD →
Benton IN building $30.43 $23.95 $54.38 WD →
Blackford IN building $30.43 $23.95 $54.38 WD →
Boone IN building $30.43 $23.95 $54.38 WD →
Carroll IN building $30.43 $23.95 $54.38 WD →
Cass IN building $30.43 $23.95 $54.38 WD →
Clinton IN building $30.43 $23.95 $54.38 WD →
DeKalb IN building $30.43 $23.95 $54.38 WD →
DeKalb IN building $30.43 $23.95 $54.38 WD →
Delaware IN building $30.43 $23.95 $54.38 WD →
Fountain IN building $30.43 $23.95 $54.38 WD →
Fulton IN building $30.43 $23.95 $54.38 WD →
Grant IN building $30.43 $23.95 $54.38 WD →
Hamilton IN building $30.43 $23.95 $54.38 WD →
Hancock IN building $30.43 $23.95 $54.38 WD →
Hendricks IN building $30.43 $23.95 $54.38 WD →
Howard IN building $30.43 $23.95 $54.38 WD →
Huntington IN building $30.43 $23.95 $54.38 WD →
Jay IN building $30.43 $23.95 $54.38 WD →
Johnson IN building $30.43 $23.95 $54.38 WD →
Madison IN building $30.43 $23.95 $54.38 WD →
Marion IN building $30.43 $23.95 $54.38 WD →
Miami IN building $30.43 $23.95 $54.38 WD →
Monroe IN building $30.43 $23.95 $54.38 WD →
Montgomery IN building $30.43 $23.95 $54.38 WD →
Morgan IN building $30.43 $23.95 $54.38 WD →
Noble IN building $30.43 $23.95 $54.38 WD →
Shelby IN building $30.43 $23.95 $54.38 WD →
Steuben IN building $30.43 $23.95 $54.38 WD →
Tippecanoe IN building $30.43 $23.95 $54.38 WD →
Tipton IN building $30.43 $23.95 $54.38 WD →
Wabash IN building $30.43 $23.95 $54.38 WD →
Warren IN building $30.43 $23.95 $54.38 WD →
Wells IN building $30.43 $23.95 $54.38 WD →
White IN building $30.43 $23.95 $54.38 WD →
Whitley IN building $30.43 $23.95 $54.38 WD →
Top-paying counties for POWER EQUIPMENT OPERATORS: GROUP 4 AIR COMPRESSOR, BITUMINOUS DISTRIBUTOR, CEMENT GUN, CONCRETE SAW, CONVEYOR, DECK HAND OILER, EARTH ROLLER, FORM GRA →