POWER EQUIPMENT OPERATORS:, BUILDING: GROUP B BACKHOES, BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD R — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATORS:, BUILDING: GROUP B BACKHOES, BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD Rs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 6 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATORS:, BUILDING: GROUP B BACKHOES, BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD R is $81.65/hr, with the middle 80% of counties paying between $81.65 and $81.65/hr. The highest state average is New York at $81.65/hr; the lowest is New York at $81.65/hr.

Bottom 10%
$81.65
Median
$81.65
Average
$81.65
Top 10%
$81.65

Range: $81.65 – $81.65/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$81.65/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+189.2%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

New York NY
Avg base: $48.85/hr
Avg total: $81.65/hr
6 rates

All Rates

6 county-level rates for POWER EQUIPMENT OPERATORS:, BUILDING: GROUP B BACKHOES, BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD R, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Broome NY building $48.85 $32.80 $81.65 WD →
Broome NY heavy $48.85 $32.80 $81.65 WD →
Broome NY highway $48.85 $32.80 $81.65 WD →
Chenango NY building $48.85 $32.80 $81.65 WD →
Chenango NY heavy $48.85 $32.80 $81.65 WD →
Chenango NY highway $48.85 $32.80 $81.65 WD →
Top-paying counties for POWER EQUIPMENT OPERATORS:, BUILDING: GROUP B BACKHOES, BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD R →