POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 5: OILER NOTES: Tunnel Premium .75 Hazmat Premium 20% Hydrographic Premium .50 FO — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 5: OILER NOTES: Tunnel Premium .75 Hazmat Premium 20% Hydrographic Premium .50 FOs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 12 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 5: OILER NOTES: Tunnel Premium .75 Hazmat Premium 20% Hydrographic Premium .50 FO is $91.57/hr, with the middle 80% of counties paying between $91.57 and $91.57/hr. The highest state average is New York at $91.57/hr; the lowest is New York at $91.57/hr.

Bottom 10%
$91.57
Median
$91.57
Average
$91.57
Top 10%
$91.57

Range: $91.57 – $91.57/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$91.57/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+224.4%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

New York NY
Avg base: $54.07/hr
Avg total: $91.57/hr
12 rates

All Rates

12 county-level rates for POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 5: OILER NOTES: Tunnel Premium .75 Hazmat Premium 20% Hydrographic Premium .50 FO, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Dutchess NY building $54.07 $37.50 $91.57 WD →
Dutchess NY highway $54.07 $37.50 $91.57 WD →
Dutchess NY heavy $54.07 $37.50 $91.57 WD →
Orange NY building $54.07 $37.50 $91.57 WD →
Orange NY highway $54.07 $37.50 $91.57 WD →
Orange NY heavy $54.07 $37.50 $91.57 WD →
Sullivan NY heavy $54.07 $37.50 $91.57 WD →
Sullivan NY building $54.07 $37.50 $91.57 WD →
Sullivan NY highway $54.07 $37.50 $91.57 WD →
Ulster NY building $54.07 $37.50 $91.57 WD →
Ulster NY highway $54.07 $37.50 $91.57 WD →
Ulster NY heavy $54.07 $37.50 $91.57 WD →
Top-paying counties for POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 5: OILER NOTES: Tunnel Premium .75 Hazmat Premium 20% Hydrographic Premium .50 FO →