POWER EQUIPMENT OPERATORS: (BACKHOE; CENTRAL MIXING PLANT; CONCRETE PLACING MACHINE; CRANE, DERRICK, DRAGLINE; HOIST, 2-DRUM; MOTOR GRADER; SHOVEL; SI — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATORS: (BACKHOE; CENTRAL MIXING PLANT; CONCRETE PLACING MACHINE; CRANE, DERRICK, DRAGLINE; HOIST, 2-DRUM; MOTOR GRADER; SHOVEL; SIs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 9 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATORS: (BACKHOE; CENTRAL MIXING PLANT; CONCRETE PLACING MACHINE; CRANE, DERRICK, DRAGLINE; HOIST, 2-DRUM; MOTOR GRADER; SHOVEL; SI is $54.42/hr, with the middle 80% of counties paying between $54.42 and $54.42/hr. The highest state average is South Carolina at $54.42/hr; the lowest is South Carolina at $54.42/hr.

Bottom 10%
$54.42
Median
$54.42
Average
$54.42
Top 10%
$54.42

Range: $54.42 – $54.42/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$54.42/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+92.8%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

South Carolina SC
Avg base: $36.00/hr
Avg total: $54.42/hr
9 rates

All Rates

9 county-level rates for POWER EQUIPMENT OPERATORS: (BACKHOE; CENTRAL MIXING PLANT; CONCRETE PLACING MACHINE; CRANE, DERRICK, DRAGLINE; HOIST, 2-DRUM; MOTOR GRADER; SHOVEL; SI, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Aiken SC heavy $36.00 $18.42 $54.42 WD →
Aiken SC building $36.00 $18.42 $54.42 WD →
Aiken SC highway $36.00 $18.42 $54.42 WD →
Allendale SC heavy $36.00 $18.42 $54.42 WD →
Allendale SC building $36.00 $18.42 $54.42 WD →
Allendale SC highway $36.00 $18.42 $54.42 WD →
Barnwell SC building $36.00 $18.42 $54.42 WD →
Barnwell SC highway $36.00 $18.42 $54.42 WD →
Barnwell SC heavy $36.00 $18.42 $54.42 WD →
Top-paying counties for POWER EQUIPMENT OPERATORS: (BACKHOE; CENTRAL MIXING PLANT; CONCRETE PLACING MACHINE; CRANE, DERRICK, DRAGLINE; HOIST, 2-DRUM; MOTOR GRADER; SHOVEL; SI →