POWER EQUIPMENT OPERATORS: ASPHALT LUTERS — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATORS: ASPHALT LUTERSs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 20 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATORS: ASPHALT LUTERS is $10.36/hr, with the middle 80% of counties paying between $10.36 and $10.36/hr. The highest state average is Puerto Rico at $10.36/hr; the lowest is Puerto Rico at $10.36/hr.

Bottom 10%
$10.36
Median
$10.36
Average
$10.36
Top 10%
$10.36

Range: $10.36 – $10.36/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$10.36/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
-63.3%
D-B rate is below market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Puerto Rico PR
Avg base: $7.25/hr
Avg total: $10.36/hr
20 rates

All Rates

20 county-level rates for POWER EQUIPMENT OPERATORS: ASPHALT LUTERS, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adjuntas PR heavy $7.25 $3.11 $10.36 WD →
Adjuntas PR highway $7.25 $3.11 $10.36 WD →
Coamo PR heavy $7.25 $3.11 $10.36 WD →
Coamo PR highway $7.25 $3.11 $10.36 WD →
Culebra PR highway $7.25 $3.11 $10.36 WD →
Culebra PR heavy $7.25 $3.11 $10.36 WD →
Jayuya PR heavy $7.25 $3.11 $10.36 WD →
Jayuya PR highway $7.25 $3.11 $10.36 WD →
Las Marias PR highway $7.25 $3.11 $10.36 WD →
Las Marias PR heavy $7.25 $3.11 $10.36 WD →
Maricao PR highway $7.25 $3.11 $10.36 WD →
Maricao PR heavy $7.25 $3.11 $10.36 WD →
Salinas PR heavy $7.25 $3.11 $10.36 WD →
Salinas PR highway $7.25 $3.11 $10.36 WD →
Santa Isabel PR heavy $7.25 $3.11 $10.36 WD →
Santa Isabel PR highway $7.25 $3.11 $10.36 WD →
Utuado PR highway $7.25 $3.11 $10.36 WD →
Utuado PR heavy $7.25 $3.11 $10.36 WD →
Vieques PR highway $7.25 $3.11 $10.36 WD →
Vieques PR heavy $7.25 $3.11 $10.36 WD →
Top-paying counties for POWER EQUIPMENT OPERATORS: ASPHALT LUTERS →