POWER EQUIPMENT OPERATOR: Summit — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR: Summits across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 60 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR: Summit is $30.27/hr, with the middle 80% of counties paying between $20.69 and $32.89/hr. The highest state average is Colorado at $28.26/hr; the lowest is Colorado at $28.26/hr.

Bottom 10%
$20.69
Median
$30.27
Average
$28.26
Top 10%
$32.89

Range: $20.69 – $32.89/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$30.27/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+7.2%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Colorado CO
Avg base: $22.21/hr
Avg total: $28.26/hr
60 rates

All Rates

60 county-level rates for POWER EQUIPMENT OPERATOR: Summit, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Eagle CO highway $24.30 $5.75 $30.05 WD →
Eagle CO highway $16.28 $4.41 $20.69 WD →
Eagle CO highway $24.38 $6.11 $30.49 WD →
Eagle CO highway $25.88 $7.01 $32.89 WD →
Eagle CO highway $22.67 $8.72 $31.39 WD →
Eagle CO highway $19.77 $4.28 $24.05 WD →
Garfield CO highway $24.30 $5.75 $30.05 WD →
Garfield CO highway $16.28 $4.41 $20.69 WD →
Garfield CO highway $24.38 $6.11 $30.49 WD →
Garfield CO highway $25.88 $7.01 $32.89 WD →
Garfield CO highway $22.67 $8.72 $31.39 WD →
Garfield CO highway $19.77 $4.28 $24.05 WD →
Grand CO highway $16.28 $4.41 $20.69 WD →
Grand CO highway $24.30 $5.75 $30.05 WD →
Grand CO highway $19.77 $4.28 $24.05 WD →
Grand CO highway $22.67 $8.72 $31.39 WD →
Grand CO highway $25.88 $7.01 $32.89 WD →
Grand CO highway $24.38 $6.11 $30.49 WD →
Jackson CO highway $24.30 $5.75 $30.05 WD →
Jackson CO highway $16.28 $4.41 $20.69 WD →
Jackson CO highway $24.38 $6.11 $30.49 WD →
Jackson CO highway $25.88 $7.01 $32.89 WD →
Jackson CO highway $22.67 $8.72 $31.39 WD →
Jackson CO highway $19.77 $4.28 $24.05 WD →
Lake CO highway $24.30 $5.75 $30.05 WD →
Lake CO highway $19.77 $4.28 $24.05 WD →
Lake CO highway $22.67 $8.72 $31.39 WD →
Lake CO highway $25.88 $7.01 $32.89 WD →
Lake CO highway $24.38 $6.11 $30.49 WD →
Lake CO highway $16.28 $4.41 $20.69 WD →
Moffat CO highway $16.28 $4.41 $20.69 WD →
Moffat CO highway $24.30 $5.75 $30.05 WD →
Moffat CO highway $19.77 $4.28 $24.05 WD →
Moffat CO highway $22.67 $8.72 $31.39 WD →
Moffat CO highway $25.88 $7.01 $32.89 WD →
Moffat CO highway $24.38 $6.11 $30.49 WD →
Pitkin CO highway $24.30 $5.75 $30.05 WD →
Pitkin CO highway $16.28 $4.41 $20.69 WD →
Pitkin CO highway $24.38 $6.11 $30.49 WD →
Pitkin CO highway $25.88 $7.01 $32.89 WD →
Pitkin CO highway $22.67 $8.72 $31.39 WD →
Pitkin CO highway $19.77 $4.28 $24.05 WD →
Rio Blanco CO highway $16.28 $4.41 $20.69 WD →
Rio Blanco CO highway $24.30 $5.75 $30.05 WD →
Rio Blanco CO highway $19.77 $4.28 $24.05 WD →
Rio Blanco CO highway $22.67 $8.72 $31.39 WD →
Rio Blanco CO highway $25.88 $7.01 $32.89 WD →
Rio Blanco CO highway $24.38 $6.11 $30.49 WD →
Routt CO highway $24.30 $5.75 $30.05 WD →
Routt CO highway $16.28 $4.41 $20.69 WD →
Routt CO highway $24.38 $6.11 $30.49 WD →
Routt CO highway $25.88 $7.01 $32.89 WD →
Routt CO highway $22.67 $8.72 $31.39 WD →
Routt CO highway $19.77 $4.28 $24.05 WD →
Summit CO highway $19.77 $4.28 $24.05 WD →
Summit CO highway $16.28 $4.41 $20.69 WD →
Summit CO highway $24.38 $6.11 $30.49 WD →
Summit CO highway $25.88 $7.01 $32.89 WD →
Summit CO highway $22.67 $8.72 $31.39 WD →
Summit CO highway $24.30 $5.75 $30.05 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR: Summit →