POWER EQUIPMENT OPERATOR, STEEL ERECTION: CRANES, HYDRAULIC CRANES, 2 DRUM DERRICKS, FORKLIFTS, BOOM TRUCKS — Prevailing Wage Rates
Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR, STEEL ERECTION: CRANES, HYDRAULIC CRANES, 2 DRUM DERRICKS, FORKLIFTS, BOOM TRUCKSs across all covered states and counties. Rates vary by location and construction type.
Across 20 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR, STEEL ERECTION: CRANES, HYDRAULIC CRANES, 2 DRUM DERRICKS, FORKLIFTS, BOOM TRUCKS is $133.21/hr, with the middle 80% of counties paying between $133.21 and $133.21/hr. The highest state average is New York at $133.21/hr; the lowest is New York at $133.21/hr.
Range: $133.21 – $133.21/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073 — Operating Engineers and Other Construction Equipment Operators.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
20 county-level rates for POWER EQUIPMENT OPERATOR, STEEL ERECTION: CRANES, HYDRAULIC CRANES, 2 DRUM DERRICKS, FORKLIFTS, BOOM TRUCKS, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Bronx | NY | building | $96.26 | $36.95 | $133.21 | WD → |
| Bronx | NY | heavy | $96.26 | $36.95 | $133.21 | WD → |
| Bronx | NY | highway | $96.26 | $36.95 | $133.21 | WD → |
| Bronx | NY | residential | $96.26 | $36.95 | $133.21 | WD → |
| Kings | NY | building | $96.26 | $36.95 | $133.21 | WD → |
| Kings | NY | residential | $96.26 | $36.95 | $133.21 | WD → |
| Kings | NY | heavy | $96.26 | $36.95 | $133.21 | WD → |
| Kings | NY | highway | $96.26 | $36.95 | $133.21 | WD → |
| New York | NY | residential | $96.26 | $36.95 | $133.21 | WD → |
| New York | NY | heavy | $96.26 | $36.95 | $133.21 | WD → |
| New York | NY | highway | $96.26 | $36.95 | $133.21 | WD → |
| New York | NY | building | $96.26 | $36.95 | $133.21 | WD → |
| Queens | NY | building | $96.26 | $36.95 | $133.21 | WD → |
| Queens | NY | heavy | $96.26 | $36.95 | $133.21 | WD → |
| Queens | NY | residential | $96.26 | $36.95 | $133.21 | WD → |
| Queens | NY | highway | $96.26 | $36.95 | $133.21 | WD → |
| Richmond | NY | residential | $96.26 | $36.95 | $133.21 | WD → |
| Richmond | NY | highway | $96.26 | $36.95 | $133.21 | WD → |
| Richmond | NY | heavy | $96.26 | $36.95 | $133.21 | WD → |
| Richmond | NY | building | $96.26 | $36.95 | $133.21 | WD → |