POWER EQUIPMENT OPERATOR: SOIL STABILIZER..$ 13.08 0.00 POWER EQUIPMENT OPERATOR: SOIL STABILIZER — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR: SOIL STABILIZER..$ 13.08 0.00 POWER EQUIPMENT OPERATOR: SOIL STABILIZERs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 16 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR: SOIL STABILIZER..$ 13.08 0.00 POWER EQUIPMENT OPERATOR: SOIL STABILIZER is $12.34/hr, with the middle 80% of counties paying between $12.34 and $12.34/hr. The highest state average is Louisiana at $12.34/hr; the lowest is Louisiana at $12.34/hr.

Bottom 10%
$12.34
Median
$12.34
Average
$12.34
Top 10%
$12.34

Range: $12.34 – $12.34/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$12.34/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
-56.3%
D-B rate is below market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Louisiana LA
Avg base: $12.34/hr
Avg total: $12.34/hr
16 rates

All Rates

16 county-level rates for POWER EQUIPMENT OPERATOR: SOIL STABILIZER..$ 13.08 0.00 POWER EQUIPMENT OPERATOR: SOIL STABILIZER, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Acadia LA highway $12.34 $0.00 $12.34 WD →
Allen LA highway $12.34 $0.00 $12.34 WD →
Assumption LA highway $12.34 $0.00 $12.34 WD →
Avoyelles LA highway $12.34 $0.00 $12.34 WD →
Beauregard LA highway $12.34 $0.00 $12.34 WD →
Evangeline LA highway $12.34 $0.00 $12.34 WD →
Iberia LA highway $12.34 $0.00 $12.34 WD →
Jefferson Davis LA highway $12.34 $0.00 $12.34 WD →
St James LA highway $12.34 $0.00 $12.34 WD →
St James LA highway $12.34 $0.00 $12.34 WD →
St Landry LA highway $12.34 $0.00 $12.34 WD →
St Mary LA highway $12.34 $0.00 $12.34 WD →
Tangipahoa LA highway $12.34 $0.00 $12.34 WD →
Vermilion LA highway $12.34 $0.00 $12.34 WD →
Vernon LA highway $12.34 $0.00 $12.34 WD →
Washington LA highway $12.34 $0.00 $12.34 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR: SOIL STABILIZER..$ 13.08 0.00 POWER EQUIPMENT OPERATOR: SOIL STABILIZER →