POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED Os across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 86 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O is $48.78/hr, with the middle 80% of counties paying between $32.49 and $71.57/hr. The highest state average is Minnesota at $51.01/hr; the lowest is Minnesota at $51.01/hr.

Bottom 10%
$32.49
Median
$48.78
Average
$51.01
Top 10%
$71.57

Range: $22.75 – $71.91/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$48.78/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+72.8%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Minnesota MN
Avg base: $34.84/hr
Avg total: $51.01/hr
86 rates

All Rates

86 county-level rates for POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Aitkin MN building $41.81 $26.87 $68.68 WD →
Anoka MN building $44.67 $26.90 $71.57 WD →
Becker MN building $27.41 $5.68 $33.09 WD →
Beltrami MN building $33.58 $26.40 $59.98 WD →
Benton MN building $41.81 $26.87 $68.68 WD →
Big Stone MN building $35.00 $0.00 $35.00 WD →
Blue Earth MN building $28.50 $8.75 $37.25 WD →
Brown MN building $31.00 $8.75 $39.75 WD →
Carlton MN building $44.67 $26.90 $71.57 WD →
Cass MN building $29.58 $13.60 $43.18 WD →
Chippewa MN building $30.75 $8.75 $39.50 WD →
Chisago MN building $44.67 $26.40 $71.07 WD →
Clay MN building $27.41 $5.68 $33.09 WD →
Clearwater MN building $29.41 $21.40 $50.81 WD →
Cottonwood MN building $31.00 $8.75 $39.75 WD →
Crow Wing MN building $29.58 $13.60 $43.18 WD →
Dakota MN building $44.67 $26.90 $71.57 WD →
Dodge MN building $41.81 $26.87 $68.68 WD →
Douglas MN building $33.58 $26.79 $60.37 WD →
Faribault MN building $36.25 $8.75 $45.00 WD →
Fillmore MN building $41.81 $26.87 $68.68 WD →
Freeborn MN building $36.25 $8.75 $45.00 WD →
Goodhue MN building $41.81 $26.87 $68.68 WD →
Grant MN building $38.00 $0.00 $38.00 WD →
Hennepin MN building $44.67 $26.90 $71.57 WD →
Houston MN building $35.18 $20.50 $55.68 WD →
Hubbard MN building $29.41 $21.40 $50.81 WD →
Isanti MN building $44.67 $26.40 $71.07 WD →
Itasca MN building $44.67 $26.90 $71.57 WD →
Jackson MN building $31.00 $8.75 $39.75 WD →
Kanabec MN building $31.16 $23.45 $54.61 WD →
Kandiyohi MN building $33.58 $26.79 $60.37 WD →
Kittson MN building $27.00 $0.00 $27.00 WD →
Koochiching MN building $44.67 $26.90 $71.57 WD →
Lac Qui Parle MN building $21.50 $1.25 $22.75 WD →
Lake MN building $44.67 $26.90 $71.57 WD →
Lake of the Woods MN building $33.58 $26.40 $59.98 WD →
Lake of the Woods MN building $33.58 $26.40 $59.98 WD →
Le Sueur MN building $28.50 $8.75 $37.25 WD →
Lincoln MN building $27.90 $5.68 $33.58 WD →
Lyon MN building $30.00 $8.75 $38.75 WD →
Mahnomen MN building $21.64 $10.24 $31.88 WD →
Marshall MN building $27.00 $0.00 $27.00 WD →
Martin MN building $28.50 $8.75 $37.25 WD →
McLeod MN building $30.75 $8.75 $39.50 WD →
Meeker MN building $44.67 $26.90 $71.57 WD →
Mille Lacs MN building $29.58 $13.60 $43.18 WD →
Morrison MN building $41.81 $26.87 $68.68 WD →
Mower MN building $42.64 $26.87 $69.51 WD →
Murray MN building $30.00 $8.75 $38.75 WD →
Nicollet MN building $30.75 $8.75 $39.50 WD →
Nobles MN building $31.16 $23.45 $54.61 WD →
Norman MN building $21.64 $10.24 $31.88 WD →
Olmsted MN building $44.67 $26.90 $71.57 WD →
Otter Tail MN building $38.00 $0.00 $38.00 WD →
Pennington MN building $29.41 $21.40 $50.81 WD →
Pine MN building $31.16 $23.45 $54.61 WD →
Pipestone MN building $27.90 $5.68 $33.58 WD →
Polk MN building $25.00 $1.25 $26.25 WD →
Pope MN building $33.58 $26.79 $60.37 WD →
Ramsey MN building $44.67 $26.90 $71.57 WD →
Red Lake MN building $25.00 $1.25 $26.25 WD →
Redwood MN building $30.00 $8.75 $38.75 WD →
Renville MN building $30.75 $8.75 $39.50 WD →
Rice MN building $42.49 $25.23 $67.72 WD →
Rock MN building $31.16 $23.45 $54.61 WD →
Roseau MN building $27.00 $0.00 $27.00 WD →
Scott MN building $44.67 $26.90 $71.57 WD →
Sherburne MN building $44.67 $26.90 $71.57 WD →
Sibley MN building $30.00 $8.75 $38.75 WD →
St Louis MN building $45.01 $26.40 $71.41 WD →
Stearns MN building $25.00 $1.98 $26.98 WD →
Steele MN building $33.00 $8.75 $41.75 WD →
Stevens MN building $37.00 $0.00 $37.00 WD →
Swift MN building $31.47 $23.45 $54.92 WD →
Todd MN building $31.00 $8.75 $39.75 WD →
Traverse MN building $36.50 $0.00 $36.50 WD →
Wabasha MN building $42.14 $26.40 $68.54 WD →
Wadena MN building $31.00 $8.75 $39.75 WD →
Waseca MN building $33.00 $8.75 $41.75 WD →
Washington MN building $45.01 $26.90 $71.91 WD →
Watonwan MN building $38.00 $8.75 $46.75 WD →
Wilkin MN building $33.92 $26.40 $60.32 WD →
Winona MN building $40.09 $25.00 $65.09 WD →
Wright MN building $45.01 $26.90 $71.91 WD →
Yellow Medicine MN building $38.00 $8.75 $46.75 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O →