POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOC — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOCs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 71 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOC is $51.18/hr, with the middle 80% of counties paying between $31.00 and $71.41/hr. The highest state average is Minnesota at $51.56/hr; the lowest is Minnesota at $51.56/hr.

Bottom 10%
$31.00
Median
$51.18
Average
$51.56
Top 10%
$71.41

Range: $19.50 – $71.91/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$51.18/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+81.3%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Minnesota MN
Avg base: $35.20/hr
Avg total: $51.56/hr
71 rates

All Rates

71 county-level rates for POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOC, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Aitkin MN building $41.73 $22.85 $64.58 WD →
Anoka MN building $45.01 $26.90 $71.91 WD →
Becker MN building $31.00 $8.75 $39.75 WD →
Beltrami MN building $33.92 $26.40 $60.32 WD →
Benton MN building $42.14 $26.40 $68.54 WD →
Big Stone MN building $36.50 $0.00 $36.50 WD →
Blue Earth MN building $38.00 $8.75 $46.75 WD →
Brown MN building $38.00 $8.75 $46.75 WD →
Carlton MN building $45.01 $26.40 $71.41 WD →
Carver MN building $45.01 $26.90 $71.91 WD →
Cass MN building $31.00 $8.75 $39.75 WD →
Chippewa MN building $38.00 $8.75 $46.75 WD →
Chisago MN building $45.01 $26.40 $71.41 WD →
Clay MN building $33.92 $26.40 $60.32 WD →
Clearwater MN building $19.08 $6.07 $25.15 WD →
Cook MN building $41.59 $23.45 $65.04 WD →
Cottonwood MN building $38.00 $8.75 $46.75 WD →
Crow Wing MN building $31.48 $19.70 $51.18 WD →
Dakota MN building $45.01 $26.90 $71.91 WD →
Dodge MN building $42.14 $26.40 $68.54 WD →
Douglas MN building $33.92 $26.40 $60.32 WD →
Faribault MN building $38.00 $8.75 $46.75 WD →
Fillmore MN building $40.09 $25.00 $65.09 WD →
Freeborn MN building $33.00 $8.75 $41.75 WD →
Goodhue MN building $42.14 $26.40 $68.54 WD →
Grant MN building $33.92 $26.40 $60.32 WD →
Hennepin MN building $45.01 $26.90 $71.91 WD →
Houston MN building $35.48 $20.50 $55.98 WD →
Hubbard MN building $31.00 $8.75 $39.75 WD →
Isanti MN building $45.01 $26.40 $71.41 WD →
Itasca MN building $45.01 $26.40 $71.41 WD →
Jackson MN building $28.50 $8.75 $37.25 WD →
Kanabec MN building $22.95 $0.69 $23.64 WD →
Kandiyohi MN building $38.00 $8.75 $46.75 WD →
Kittson MN building $33.92 $26.40 $60.32 WD →
Koochiching MN building $45.01 $26.40 $71.41 WD →
Lac Qui Parle MN building $18.00 $1.50 $19.50 WD →
Lake MN building $45.01 $26.40 $71.41 WD →
Lake of the Woods MN building $33.92 $26.40 $60.32 WD →
Lake of the Woods MN building $33.92 $26.40 $60.32 WD →
Le Sueur MN building $33.00 $8.75 $41.75 WD →
Lincoln MN building $27.50 $3.50 $31.00 WD →
Lyon MN building $27.50 $3.50 $31.00 WD →
Mahnomen MN building $19.75 $4.35 $24.10 WD →
Marshall MN building $33.92 $26.40 $60.32 WD →
Martin MN building $28.50 $8.75 $37.25 WD →
McLeod MN building $30.00 $8.75 $38.75 WD →
Meeker MN building $30.00 $8.75 $38.75 WD →
Mille Lacs MN building $42.14 $26.40 $68.54 WD →
Morrison MN building $31.48 $19.70 $51.18 WD →
Mower MN building $40.09 $25.00 $65.09 WD →
Murray MN building $27.50 $3.50 $31.00 WD →
Nicollet MN building $38.00 $8.75 $46.75 WD →
Nobles MN building $27.50 $3.50 $31.00 WD →
Norman MN building $31.00 $3.76 $34.76 WD →
Olmsted MN building $45.01 $26.40 $71.41 WD →
Otter Tail MN building $31.00 $8.75 $39.75 WD →
Pennington MN building $19.75 $4.35 $24.10 WD →
Pine MN building $41.73 $22.85 $64.58 WD →
Pipestone MN building $27.50 $3.50 $31.00 WD →
Polk MN building $19.75 $4.35 $24.10 WD →
Pope MN building $32.26 $25.00 $57.26 WD →
Ramsey MN building $45.01 $26.90 $71.91 WD →
Red Lake MN building $25.62 $19.70 $45.32 WD →
Redwood MN building $38.00 $8.75 $46.75 WD →
Renville MN building $38.00 $8.75 $46.75 WD →
Rice MN building $33.00 $8.75 $41.75 WD →
Rock MN building $27.50 $3.50 $31.00 WD →
Roseau MN building $33.92 $26.40 $60.32 WD →
Scott MN building $45.01 $26.90 $71.91 WD →
Sherburne MN building $45.01 $26.90 $71.91 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOC →