POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-1 MASTER MECHANIC NOTES: LOADER OPERATOR .50 SHOVAL OPERATORS 1.00 HAZMAT PREMIUM OVER REGULAR RA — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-1 MASTER MECHANIC NOTES: LOADER OPERATOR .50 SHOVAL OPERATORS 1.00 HAZMAT PREMIUM OVER REGULAR RAs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 12 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-1 MASTER MECHANIC NOTES: LOADER OPERATOR .50 SHOVAL OPERATORS 1.00 HAZMAT PREMIUM OVER REGULAR RA is $99.27/hr, with the middle 80% of counties paying between $99.27 and $99.27/hr. The highest state average is New York at $99.27/hr; the lowest is New York at $99.27/hr.

Bottom 10%
$99.27
Median
$99.27
Average
$99.27
Top 10%
$99.27

Range: $99.27 – $99.27/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$99.27/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+251.6%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

New York NY
Avg base: $64.02/hr
Avg total: $99.27/hr
12 rates

All Rates

12 county-level rates for POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-1 MASTER MECHANIC NOTES: LOADER OPERATOR .50 SHOVAL OPERATORS 1.00 HAZMAT PREMIUM OVER REGULAR RA, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Dutchess NY building $64.02 $35.25 $99.27 WD →
Dutchess NY highway $64.02 $35.25 $99.27 WD →
Dutchess NY heavy $64.02 $35.25 $99.27 WD →
Orange NY building $64.02 $35.25 $99.27 WD →
Orange NY highway $64.02 $35.25 $99.27 WD →
Orange NY heavy $64.02 $35.25 $99.27 WD →
Sullivan NY heavy $64.02 $35.25 $99.27 WD →
Sullivan NY building $64.02 $35.25 $99.27 WD →
Sullivan NY highway $64.02 $35.25 $99.27 WD →
Ulster NY building $64.02 $35.25 $99.27 WD →
Ulster NY highway $64.02 $35.25 $99.27 WD →
Ulster NY heavy $64.02 $35.25 $99.27 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-1 MASTER MECHANIC NOTES: LOADER OPERATOR .50 SHOVAL OPERATORS 1.00 HAZMAT PREMIUM OVER REGULAR RA →