Quick Answer

Across 10 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE;BACKHHOE; TRACKHOE; EXC is $53.12/hr, with the middle 80% of counties paying between $53.12 and $53.12/hr. The highest state average is Oklahoma at $53.12/hr; the lowest is Oklahoma at $53.12/hr.

Bottom 10%
$53.12
Median
$53.12
Average
$53.12
Top 10%
$53.12

Range: $53.12 – $53.12/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$53.12/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+88.2%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Oklahoma OK
Avg base: $34.07/hr
Avg total: $53.12/hr
10 rates

All Rates

10 county-level rates for POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE;BACKHHOE; TRACKHOE; EXC, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adair OK building $34.07 $19.05 $53.12 WD →
Cherokee OK building $34.07 $19.05 $53.12 WD →
Craig OK building $34.07 $19.05 $53.12 WD →
Delaware OK building $34.07 $19.05 $53.12 WD →
Mayes OK building $34.07 $19.05 $53.12 WD →
McIntosh OK building $34.07 $19.05 $53.12 WD →
Nowata OK building $34.07 $19.05 $53.12 WD →
Okfuskee OK building $34.07 $19.05 $53.12 WD →
Ottawa OK building $34.07 $19.05 $53.12 WD →
Washington OK building $34.07 $19.05 $53.12 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE;BACKHHOE; TRACKHOE; EXC →