Quick Answer

Across 45 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR GROUP 3 AIR COMPRESSOR, TRACK OR SELF-PROPELLED; BULK CEMENT BATCHING- PLANTS; CONVEYORS; CONCRETE MIERS FIREMENT, GENERATORS is $63.05/hr, with the middle 80% of counties paying between $63.05 and $63.05/hr. The highest state average is Illinois at $63.05/hr; the lowest is Illinois at $63.05/hr.

Bottom 10%
$63.05
Median
$63.05
Average
$63.05
Top 10%
$63.05

Range: $63.05 – $63.05/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$63.05/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+123.3%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Illinois IL
Avg base: $34.30/hr
Avg total: $63.05/hr
45 rates

All Rates

45 county-level rates for POWER EQUIPMENT OPERATOR GROUP 3 AIR COMPRESSOR, TRACK OR SELF-PROPELLED; BULK CEMENT BATCHING- PLANTS; CONVEYORS; CONCRETE MIERS FIREMENT, GENERATORS, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alexander IL building $34.30 $28.75 $63.05 WD →
Champaign IL building $34.30 $28.75 $63.05 WD →
Christian IL building $34.30 $28.75 $63.05 WD →
Clark IL building $34.30 $28.75 $63.05 WD →
Clay IL building $34.30 $28.75 $63.05 WD →
Coles IL building $34.30 $28.75 $63.05 WD →
Crawford IL building $34.30 $28.75 $63.05 WD →
Cumberland IL building $34.30 $28.75 $63.05 WD →
De Witt IL building $34.30 $28.75 $63.05 WD →
Douglas IL building $34.30 $28.75 $63.05 WD →
Edgar IL building $34.30 $28.75 $63.05 WD →
Edwards IL building $34.30 $28.75 $63.05 WD →
Effingham IL building $34.30 $28.75 $63.05 WD →
Fayette IL building $34.30 $28.75 $63.05 WD →
Ford IL building $34.30 $28.75 $63.05 WD →
Franklin IL building $34.30 $28.75 $63.05 WD →
Gallatin IL building $34.30 $28.75 $63.05 WD →
Hamilton IL building $34.30 $28.75 $63.05 WD →
Hardin IL building $34.30 $28.75 $63.05 WD →
Iroquois IL building $34.30 $28.75 $63.05 WD →
Jackson IL building $34.30 $28.75 $63.05 WD →
Jasper IL building $34.30 $28.75 $63.05 WD →
Jefferson IL building $34.30 $28.75 $63.05 WD →
Johnson IL building $34.30 $28.75 $63.05 WD →
Lawrence IL building $34.30 $28.75 $63.05 WD →
Macon IL building $34.30 $28.75 $63.05 WD →
Macon IL residential $34.30 $28.75 $63.05 WD →
Marion IL building $34.30 $28.75 $63.05 WD →
Massac IL building $34.30 $28.75 $63.05 WD →
Moultrie IL building $34.30 $28.75 $63.05 WD →
Perry IL building $34.30 $28.75 $63.05 WD →
Piatt IL building $34.30 $28.75 $63.05 WD →
Pope IL building $34.30 $28.75 $63.05 WD →
Pulaski IL building $34.30 $28.75 $63.05 WD →
Richland IL building $34.30 $28.75 $63.05 WD →
Saline IL building $34.30 $28.75 $63.05 WD →
Sangamon IL residential $34.30 $28.75 $63.05 WD →
Sangamon IL building $34.30 $28.75 $63.05 WD →
Shelby IL building $34.30 $28.75 $63.05 WD →
Union IL building $34.30 $28.75 $63.05 WD →
Vermilion IL building $34.30 $28.75 $63.05 WD →
Wabash IL building $34.30 $28.75 $63.05 WD →
Wayne IL building $34.30 $28.75 $63.05 WD →
White IL building $34.30 $28.75 $63.05 WD →
Williamson IL building $34.30 $28.75 $63.05 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR GROUP 3 AIR COMPRESSOR, TRACK OR SELF-PROPELLED; BULK CEMENT BATCHING- PLANTS; CONVEYORS; CONCRETE MIERS FIREMENT, GENERATORS →