POWER EQUIPMENT OPERATOR GROUP 3 A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE, BALL — Prevailing Wage Rates
Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR GROUP 3 A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE, BALLs across all covered states and counties. Rates vary by location and construction type.
Across 12 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR GROUP 3 A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE, BALL is $87.37/hr, with the middle 80% of counties paying between $87.37 and $87.37/hr. The highest state average is New York at $87.37/hr; the lowest is New York at $87.37/hr.
Range: $87.37 – $87.37/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073 — Operating Engineers and Other Construction Equipment Operators.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
12 county-level rates for POWER EQUIPMENT OPERATOR GROUP 3 A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE, BALL, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Dutchess | NY | building | $53.82 | $33.55 | $87.37 | WD → |
| Dutchess | NY | highway | $53.82 | $33.55 | $87.37 | WD → |
| Dutchess | NY | heavy | $53.82 | $33.55 | $87.37 | WD → |
| Orange | NY | building | $53.82 | $33.55 | $87.37 | WD → |
| Orange | NY | highway | $53.82 | $33.55 | $87.37 | WD → |
| Orange | NY | heavy | $53.82 | $33.55 | $87.37 | WD → |
| Sullivan | NY | heavy | $53.82 | $33.55 | $87.37 | WD → |
| Sullivan | NY | building | $53.82 | $33.55 | $87.37 | WD → |
| Sullivan | NY | highway | $53.82 | $33.55 | $87.37 | WD → |
| Ulster | NY | building | $53.82 | $33.55 | $87.37 | WD → |
| Ulster | NY | highway | $53.82 | $33.55 | $87.37 | WD → |
| Ulster | NY | heavy | $53.82 | $33.55 | $87.37 | WD → |