POWER EQUIPMENT OPERATOR: GROUP 2 AGGREGATE PLANT, ASPHALT PLANT MIXER, ASPHALT LAYDOWN MACHINE, BACKHOE, BEE GEE OPERATOR BORING MACHINE, CONCRETE BA — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR: GROUP 2 AGGREGATE PLANT, ASPHALT PLANT MIXER, ASPHALT LAYDOWN MACHINE, BACKHOE, BEE GEE OPERATOR BORING MACHINE, CONCRETE BAs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR: GROUP 2 AGGREGATE PLANT, ASPHALT PLANT MIXER, ASPHALT LAYDOWN MACHINE, BACKHOE, BEE GEE OPERATOR BORING MACHINE, CONCRETE BA is $42.03/hr, with the middle 80% of counties paying between $42.03 and $42.03/hr. The highest state average is Arizona at $42.03/hr; the lowest is Arizona at $42.03/hr.

Bottom 10%
$42.03
Median
$42.03
Average
$42.03
Top 10%
$42.03

Range: $42.03 – $42.03/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$42.03/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+48.9%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Arizona AZ
Avg base: $30.31/hr
Avg total: $42.03/hr
15 rates

All Rates

15 county-level rates for POWER EQUIPMENT OPERATOR: GROUP 2 AGGREGATE PLANT, ASPHALT PLANT MIXER, ASPHALT LAYDOWN MACHINE, BACKHOE, BEE GEE OPERATOR BORING MACHINE, CONCRETE BA, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Apache AZ heavy $30.31 $11.72 $42.03 WD →
Cochise AZ heavy $30.31 $11.72 $42.03 WD →
Coconino AZ heavy $30.31 $11.72 $42.03 WD →
Gila AZ heavy $30.31 $11.72 $42.03 WD →
Graham AZ heavy $30.31 $11.72 $42.03 WD →
Greenlee AZ heavy $30.31 $11.72 $42.03 WD →
La Paz AZ heavy $30.31 $11.72 $42.03 WD →
Maricopa AZ heavy $30.31 $11.72 $42.03 WD →
Mohave AZ heavy $30.31 $11.72 $42.03 WD →
Navajo AZ heavy $30.31 $11.72 $42.03 WD →
Pima AZ heavy $30.31 $11.72 $42.03 WD →
Pinal AZ heavy $30.31 $11.72 $42.03 WD →
Santa Cruz AZ heavy $30.31 $11.72 $42.03 WD →
Yavapai AZ heavy $30.31 $11.72 $42.03 WD →
Yuma AZ heavy $30.31 $11.72 $42.03 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR: GROUP 2 AGGREGATE PLANT, ASPHALT PLANT MIXER, ASPHALT LAYDOWN MACHINE, BACKHOE, BEE GEE OPERATOR BORING MACHINE, CONCRETE BA →