POWER EQUIPMENT OPERATOR GROUP 1AAA (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR GROUP 1AAA (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATEs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 39 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR GROUP 1AAA (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE is $90.91/hr, with the middle 80% of counties paying between $90.91 and $90.91/hr. The highest state average is Washington at $90.91/hr; the lowest is Washington at $90.91/hr.

Bottom 10%
$90.91
Median
$90.91
Average
$90.91
Top 10%
$90.91

Range: $90.91 – $90.91/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$90.91/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+222%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Washington WA
Avg base: $63.59/hr
Avg total: $90.91/hr
39 rates

All Rates

39 county-level rates for POWER EQUIPMENT OPERATOR GROUP 1AAA (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adams WA highway $63.59 $27.32 $90.91 WD →
Asotin WA highway $63.59 $27.32 $90.91 WD →
Benton WA highway $63.59 $27.32 $90.91 WD →
Chelan WA highway $63.59 $27.32 $90.91 WD →
Clallam WA highway $63.59 $27.32 $90.91 WD →
Clark WA highway $63.59 $27.32 $90.91 WD →
Columbia WA highway $63.59 $27.32 $90.91 WD →
Cowlitz WA highway $63.59 $27.32 $90.91 WD →
Douglas WA highway $63.59 $27.32 $90.91 WD →
Ferry WA highway $63.59 $27.32 $90.91 WD →
Franklin WA highway $63.59 $27.32 $90.91 WD →
Garfield WA highway $63.59 $27.32 $90.91 WD →
Grant WA highway $63.59 $27.32 $90.91 WD →
Grays Harbor WA highway $63.59 $27.32 $90.91 WD →
Island WA highway $63.59 $27.32 $90.91 WD →
Jefferson WA highway $63.59 $27.32 $90.91 WD →
King WA highway $63.59 $27.32 $90.91 WD →
Kitsap WA highway $63.59 $27.32 $90.91 WD →
Kittitas WA highway $63.59 $27.32 $90.91 WD →
Klickitat WA highway $63.59 $27.32 $90.91 WD →
Lewis WA highway $63.59 $27.32 $90.91 WD →
Lincoln WA highway $63.59 $27.32 $90.91 WD →
Mason WA highway $63.59 $27.32 $90.91 WD →
Okanogan WA highway $63.59 $27.32 $90.91 WD →
Pacific WA highway $63.59 $27.32 $90.91 WD →
Pend Oreille WA highway $63.59 $27.32 $90.91 WD →
Pierce WA highway $63.59 $27.32 $90.91 WD →
San Juan WA highway $63.59 $27.32 $90.91 WD →
Skagit WA highway $63.59 $27.32 $90.91 WD →
Skamania WA highway $63.59 $27.32 $90.91 WD →
Snohomish WA highway $63.59 $27.32 $90.91 WD →
Spokane WA highway $63.59 $27.32 $90.91 WD →
Stevens WA highway $63.59 $27.32 $90.91 WD →
Thurston WA highway $63.59 $27.32 $90.91 WD →
Wahkiakum WA highway $63.59 $27.32 $90.91 WD →
Walla Walla WA highway $63.59 $27.32 $90.91 WD →
Whatcom WA highway $63.59 $27.32 $90.91 WD →
Whitman WA highway $63.59 $27.32 $90.91 WD →
Yakima WA highway $63.59 $27.32 $90.91 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR GROUP 1AAA (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE →